Building 33 Clean Room Bundle Assembly Operation
- Job Safety Analysis Form
- TailGate Release Form
- Material Safety Data Sheet Dip Strip
- Material Safety Data Sheet Neutralizer
- Material Safety Data Sheet 29CFR
- Material Safety Data Sheet Dip Clean
- Waste Management Procedures
- Tailgate Meetings Minutes:
- 23 September 2013: we reviewed the various safety aspects of the work in building 33. We discussed the work plan for the week: a) finish the bundling and jacketing of Cable 23 that is on the polls, and then make Cables 24/25 and start Cables 26/27. Two cables are made at the same time on the polls. b) Tan will solder AXON-06 and do the stripping/soldering of data-Cables 22/23/24/25. The Tailgate Release Form can be found here: TailgateSafety_23Sept13.pdf .
- 30 September 2013: no specific safety issues came up this week. Work plan for the week: a) assemble Data-Cables 28/29 and 30/31 and b) Tan to solder Data-Cables 26/27 and possibly 28/29. The Tailgate Release Form can be found here: TailGateSafety_30Sept13.pdf .
Building 224 Potting Operation
- Potting and Braid EMI termination procedure
Hysol (Henkel/Loctite) EA 9396 potting epoxy material safety data sheets [Part A
][Part B
]
Epoxies Etc conductive epoxy 40-3905
for bonding braid to potting tube: Material safety Data Sheets: [40-3905RSI ][40-3905CCL]