Attendees: 

Meeting Agenda

Previous Meeting Notes: 2023-09-26 MEC-U Project Controls and Data Systems Team Meetings

 

Approx. Time

Agenda ItemRelated LinksNotes



Announcements


Jama Review - Motion FRS

  • Nick Lentz sent out a Motion Functional Requirement Specification review on Jama. Please review and add comments. Not for approval. 

Cable Plant

  • MEC-U model is updated per the latest LLE model. 
  • Working with Ted to define penetration locations in the Equipment Platform. 
  • Preliminary Tray and Rack naming convention is defined.
    • Along with XEH room numbers. 
30 - 45Review DR Recommendations and Action Items

MECUCOLLEC-12 - Getting issue details... STATUS

MECUCOLLEC-16 - Getting issue details... STATUS

MECUCOLLEC-11 - Getting issue details... STATUS

https://app.smartsheet.com/reports/75WGW5vHGXrmmrm9JhVpvw8QxXjQppxCHWcP8mq1?view=grid

Review recommendations and status on action items from the November DR. 

Including status on unreleased documentation. 


FY24-DR-14

FY24-DR-12

Jing Yin 15 - 30Timing Requirements for MEC-U


Operation of both lasers independently.

Multi-TPG architecture. 

Next Meeting

Date

Objectives







Action Items:

DescriptionDue dateAssigneeTask appears on
  • Require concept for toggling power on/off to small motors (CosyLab contacted)
MEC-U Collective Team Meetings
  • Seeking existing SLAC solution for closed loop pointing stability loop (vision/motor)
MEC-U Collective Team Meetings
  • Require concept for toggling power on/off to GigE cameras (CosyLab contacted)
MEC-U Collective Team Meetings
  • Omar Quijano To work on documenting SLAC's IT infrastructure design including hardware specs and key information.
Omar Quijano2023-02-21 MEC-U Project Controls and Data Systems Team Meetings
  • Terzi, Ken To adjust some items on the presentation then send out to the group and Omar. Mitchell Cabral Will upload this to the Sharepoint.
Terzi, Ken2023-02-21 MEC-U Project Controls and Data Systems Team Meetings
Barry FishlerSet Point API WG pt.2
  • Jing Yin TPR Card Specification Stub (Specific question from Ken: Number of outputs for TTL? LVTTL or TTL? Both?)
Jing Yin2023-02-07 MEC-U Project Controls and Data Systems Team Meetings
Tyler Johnson2022-11-14 MEC-U Project Controls and Data Systems Team Meetings
  • SLAC to provide GUI standards for laser systems (standards in development.). Follow up. Mitchell Cabral 
Mitchell Cabral2022-11-03 MECU LLNL/SLAC Meeting
  • LLNL to share C++ standards for SLAC review. Follow up. Vinod Gopalan
Vinod Gopalan2022-11-03 MECU LLNL/SLAC Meeting