You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Once you have the carrier hooked up, and the detector assembled, connected to the cooling system, power and fiber optics, you can power up the detector. For carrier evaluation, you do not need to connect timing fiber optics.

Once powered up, you will see the current consumption go to 1.7Amps, then go down to ~945mAmps when the FPGA is configured. Once the ASICs are configured, the current consumption will go up to 3.2Amps if all ASICs are available.

  • No labels