You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »

 CAL Calibration Runs - electrons

Run 691 is the first run of position scan cal-calibration runs (Jan Conrad).

(Dave Smith comments(smile) It was the night of 27 to 28 July. CAL HI trigger never fired for the whole night, because the thresholds, which were supposed to be set to 1000 MeV (about 20 FHE DAC counts) were all set to 127 counts. This is being fixed right now (afternoon of28th). 

To see the FHE DAC settings: from the eLog, for a given run, click on the "config" report link, and way down in the .pdf file there are tables of CAL GCFE settings.

Runs with Baseline configuration - electrons

These runs were taken with baseline configuration. Time settings for those may not be optimal, please verify that before you do your anlaysis. We need to verify if the configurations agree with the description

700000695 to 700000700
BT1,BT2,BT3,BT13,BT15

Runs with ACD timed in with CAL and TKR - electrons

These runs were used to time in the ACD.

700000821 and 7000000822

Runs with ACD timed in with CAL and TKR

These runs were used to time in the ACD.

700000821 and 7000000822

 

Runs with error events

These runs need to be studied for eventds

700000611

 

ACD Tiles

Run

  • No labels