Agenda:
- Status of SVT layers L0 and L1 in simulation/readout/reconstruction — SVT Group.
- Status of 2019 Simulations:
- Simulation production — Bradley
- Trigger simulation — Kyle
- Status of open critical issues.
- AOB/Questions
Notes:
- SVT Status: Omar does not have time, Matt Solt can look at this next week.
- The V1 and beta1 detectors are now, almost, fixed and ready to go. Pull request will be updated today.
- MC 2019
- Bradley is ready to run the A' samples. The data will need to be run through SLIC again.
- The generator work for 4.55 GeV is ready to go through SLIC with the hybrid detector.
- We need a run number for 2019 data. ( 1M through 1M+4 are L0 run numbers.) == 1M+11
- Jeremy will add the new run, and leave a trace of what he did so we can learn how to do this.
- Kyle is ready to run the trigger studies.
- Needs the new A' files.
- For rate estimation he will need full beam
- Crititical tagged Issues:
- Hodo Evio to LCIO is finished. (late last week)
- Rafo will start working on the reconstruction code.
- After recon code is done, he can implement the plots for the hodoscope.
- Maurik will look at the iss479 bug.
- Norman Q: Running the V0 reprocess is finished. They need to be copied back to JLab and then to tape.