You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Current »

Agenda:

  1. Status of SVT layers L0 and L1 in simulation/readout/reconstruction         — SVT Group.
  2. Status of 2019 Simulations:
    1. Simulation production                                                                         — Bradley
    2. Trigger simulation                                                                                — Kyle
  3. Status of open critical issues.        
  4. AOB/Questions

Notes: 

  1. SVT Status:  Omar does not have time, Matt Solt can look at this next week.
    1. The V1 and beta1 detectors are now, almost, fixed and ready to go. Pull request will be updated today. 
  2. MC 2019
    1. Bradley is ready to run the A' samples. The data will need to be run through SLIC again. 
      1. The generator work for 4.55 GeV is ready to go through SLIC with the hybrid detector.
      2. We need a run number for 2019 data. ( 1M through 1M+4 are L0 run numbers.) == 1M+11
      3. Jeremy will add the new run, and leave a trace of what he did so we can learn how to do this.
    2. Kyle is ready to run the trigger studies. 
      1. Needs the new A' files.
      2. For rate estimation he will need full beam 
  3. Crititical tagged Issues:
    1. Hodo Evio to LCIO is finished. (late last week)
    2. Rafo will start working on the reconstruction code. 
    3. After recon code is done, he can implement the plots for the hodoscope.
    4. Maurik will look at the iss479 bug.
  4.  Norman Q: Running the V0 reprocess is finished. They need to be copied back to JLab and then to tape.
  • No labels