Program for day shift 9/8

For all following activities keep CU at 0 angle, direct beam in center of tower 3. 

 particle

 energy

trigger

events

 purpose

mode

 e

 2.5

 S2+NOSh+C1+C2

 

 complete full brem program at 2.5GeV

 collect up to 2.4M evts combining with owl shift runs - same CU configuration

 e

 2.5

 S2+S4+NOSh+C1+C2

 100K

 increase statistics for tagged photons

 with same CU configuration, change trigger

 e

 1

 S2+NOSh+C1+C2

 10K

 1GeV e in the CU for calibration

magnet off

 e

 0.5

 S2+NOSh+C1+C2

 10K

 0.5 GeV e in the CU for calibration

magnet off

 e

1

 S2+S4+NOSh+C1+C2

 200K

 1 GeV photon tagged

magnet on at scaled current (240A); collect runs of 25K evts each

 e

 1

  S2+NOSh+C1+C2+Sback

 10K

test to redefine full-brem photon trigger to maximize  efficiency

add Sback after tagger and in trigger, take data with no AD

 e

1

 S2+NOSh+C1+C2

 10k

 test to get full-brem+AD

read sync AD but full-brem trigger; test data readout rate and synchronization

 e

 1

 S2+NOSh+C1+C2(Sback?)

 

 full brem at 1GeV

 collect 2.4 M evts in 250K runs

 

 

 

 

 

 

 e

2.5

  S2+S4+NOSh+C1+C2

 100K

 photon tagging

synchronized with AD; scan the 6 positions of the CU as posted next to the XYtable

  e


2.5

  S1+S2+NOSh+C1+C2

  2.4M

 full-brem

NON synchronized with AD; scan the 6 positions of the CU as posted next to the  table