Wire Scanners, Collimators and Beamline Motion

Table of Contents

Meeting Minutes

May 23, 2006

(Click Here for PDF Version)

May 2, 2006

(PDF Version)

April 18, 2006

(PDF Version)

April 4, 2006

(PDF Version)

March 30, 2006

(PDF Version)

March 14, 2006

(PDF Version)

March 7, 2006

(PDF Version)

February 28, 2006


February 21, 2006


February 14, 2006

(PDF Version)

January 31, 2006

(PDF Version)

January 24, 2006

(PDF Version)

January 17, 2006

(PDF Version)

January 10, 2006

(PDF Version)

Physics Requirements Documents

LCLS : Physics Requirements Document 1.1-323 (PDF Format)

LCLS-II : Injector/Linac Wire Scanner System Requirements (LCLSII-2.4-PR-0099)

              LCLS-II General Motion and Fast Wire Scanner Controls requirements (LCLSII-2.7-PR-0808)


Engineering Design Documents

LCLS : Mechanical Engineering Specifications Document 1.3-105 (PDF Format)

         Controls Engineering Specification Document

LCLS-II : LCLS-II General Motion and Fast Wire Scanner Engineering Specifications (LCLSII-2.7-ES-0809)

How-To Documents 

Currently, only Wire Scanners in the injection area have an associated schedule. Schedules for Collimator Control, Beamline motion and others are forthcoming.

Schedules

Currently, only Wire Scanners in the injection area have an associated schedule. Schedules for Collimator Control, Beamline motion and others are forthcoming.

Software

Configuring Controls Hardware

Motion control hardware includes electronics, cabling, termination and transition panels and software. It also (typically) includes LVDT equipment for position readback. Wire scanner subsystems also require synchronisation with ADCs which determine the beam intensity when it interacts with the wire.

Detectors for Wire Scanners

Notes on Wire Scanner Detector Positions and Requirements