You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 10 Next »

View the ST mailing list

Sign up for the mailing list

From 2002-2007, the agenda page was here

Summaries of these meetings are given as Science Tools Updates

Frequency: biweekly, Wed.

Time:  08:00 Pacific

Location: GLAST Community on  EVO (no video needed)

Notes: Test and adjust your microphone gain, and avoid an open mic, which may cause echoes. The Workbook has tips on using EVO

March 26, 2008

News incl. Beta Test
Software Freeze and Science Tools
Updates from the development areas
  • Databases and related utilities
  • Analysis tools
    • Likelihood analysis
    • GRBs
    • Pulsars
  • Observation simulation
  • User interface/software infrastructure

Feb 13, 2008

News

Bill presented the Pass 6 analysis last week at the workshop in Bari. Riccardo also presented improvements to the energy assignment for events. These are exciting developments for the IRFs (and also for background rejection). These will be topics for the meeting of the IRF Working Group tomorrow.

LAT data products

Baselining the ICD and File Format Documents, and attempting to sign off requirements (Ground System Requirements or LAT Level 3) related to product generation and delivery were intense efforts leading up to the Flight Operations Review last week. The ICD and FFD are baselined, thanks to David's stamina. The data products generated by the L1 pipeline (LS-001, -002, and -005) did not quite meet the expectations of the ingest system at the GSSC. Some tweaking at least is needed, and will result in Rev. A of the FFD. At this time, I don't know how the process will work for making updates to the FFD.

Updates from the development areas
  • Databases and related utilities
  • Analysis tools
    • Likelihood analysis
    • GRBs
    • Pulsars
  • Observation simulation
  • User interface/software infrastructure

Jan 16, 2008

News

News goes here. You might be interested to look at Pat's posting on UIDL to the User Interface mailing list.

The most-current news regarding the Big Run is the Big Run Checklist; it includes a recently-updated timeline that forecasts the availability of the 1-year run data in ~mid-April.

LAT data products
Updates from the development areas
  • Databases and related utilities
  • Analysis tools
    • Likelihood analysis
    • GRBs
    • Pulsars
  • Observation simulation
  • User interface/software infrastructure
  • No labels