Introduction

There are three periods of test beams in which 3D sensors will be tested at CERN. This page contains a placeholder for notes/reminders for preparation.

MCC board

Description of the board and how to operate it here: MCC boards at SLAC.

  • Modification of the Oslo reconstruction code Ole
  • Modify the BAT online monitoring Pelle,BAT expert
  • Implement the ATLAS module/MCC in the EUDET framework Georg
  • Implement online monitoring capabilities (minimum is correlation plots) for each channel in EUDET framework Georg
  • Tests to be done at CERN
    • Run source scan with >1 chip, moving the source over the chips to see hits in all attached chips for same source scan Pelle & Alessandro
    • Run with BAT software to check monitoring

EUDET Telescope

  • Hardware modifications on TPLL Jens
    • TPLL boards from Oslo and Manchester are modified, already sent? Ole,Cinzia
  • Mount for devices ?
    • How many devices can fit in the telescope

10-17 October

DUT's
  • List of devices under test
    • STA-3D (2E,3E and 4E?)
      • Check if the 2E and 4E can be revived Pelle, Alessandro
    • CNM
    • SINTEF
    • FBK (irradiated?)
Run plan

Should focus on measurements that require the extra resolutions

  • Charge sharing
  • Electrode charge collection efficiency

24-04 November

This assumes that we have access to the Morpurgo magnet.

DUT's
  • List of devices under test
    • STA-3D (2E,3E and 4E?)
    • CNM
    • SINTEF
    • FBK (irradiated?)
  • Mounting (using BAT either in H6 or H8) ?
    • Prefered choice: Use the cooling box prepared for EUDET TB period (above), needed if we test irradiated sensors
    • Backup choice is to use box from May if there is NO? required cooling
Run plan

Should focus on the measurements to validate the 3D performance and fill in the information we are lacking from the May TB.

  • Angle scan
  • Magnetic field strength scan

20-25 November

This period is in H6 without magnetic field.

DUT's
  • List of devices under test
    • STA-3D (2E,3E and 4E?)
    • CNM
    • SINTEF
    • FBK (irradiated?)
  • Mounting
    • Same comments as above.
    • Irradiated sensors should be available, see earlier comments on mounting
Run plan