The original version of the Group-C to-do list (as of June 17 2009) if from Tim Nelson.
1- Room
- Fix HVAC leak.
- to do: Philippe, talk to Tim to uderstand current status and what to do next.
- Phone installtion: DONE
- Fiber optic installation
- Followed by Jim: Being done.
2- OGP
- sd
- f
dfg