Attendance:


Presentation:

Agenda/Notes:


  1.  ePixM:
    1. Beamtime prep, Status:
      1. Xtalk study (Xavier) 
        • Presentation on Xtalk
      2. Getting the detector running in DAQ; (Alex)
        • Update
      3. Take some copper fluorescence data (Zongde)
      4. Setup insatllation at MFX beam dump table, And check the fibers connection to the server; 
        • Tuesday, August 27, 9 am - 12 pm
        • Moving forward to the beam table date:
      5. Physical setup to secure the camera;
        • Same as last beamtime
      6. Checking we have the multitosingle mode converter box; 
        • Will deploy the one from TID
      7. Testing the timing scan and trigger rate setting script;
        • Timing scan tested.  
        • Intensity scan should be same as before.
      8. Setting up the pre-setup meeting (include TID people);
        • Next week 
      9. Get the measurement plan (Zongde)
        • next week ;
      10. Schedule the staffing;
        • Day shift (6am-6pm) Sunday, 1st, Sep. 
          • Shift1, 6am-1pm:   Conny, Kaz, Alex,Philip
          • Shift2, 11am-6pm: 
      11. Ensure we have the needed support;
  • No labels