Attendance:
Presentation:
Agenda/Notes:
- ePixM:
- Beamtime prep, Status:
- Xtalk study (Xavier)
- Presentation on Xtalk
- Getting the detector running in DAQ; (Alex)
- Update
- Take some copper fluorescence data (Zongde)
- Setup insatllation at MFX beam dump table, And check the fibers connection to the server;
- Tuesday, August 27, 9 am - 12 pm
- Moving forward to the beam table date:
- Physical setup to secure the camera;
- Same as last beamtime
- Checking we have the multitosingle mode converter box;
- Will deploy the one from TID
- Testing the timing scan and trigger rate setting script;
- Timing scan tested.
- Intensity scan should be same as before.
- Setting up the pre-setup meeting (include TID people);
- Next week
- Get the measurement plan (Zongde)
- next week ;
- Schedule the staffing;
- Day shift (6am-6pm) Sunday, 1st, Sep.
- Shift1, 6am-1pm: Conny, Kaz, Alex,Philip
- Shift2, 11am-6pm:
- Day shift (6am-6pm) Sunday, 1st, Sep.
- Ensure we have the needed support;
- Xtalk study (Xavier)
- Beamtime prep, Status: