Attendance:


Presentation:


Agenda/Notes:


  1.  ePixM:
    1. Beamtime prep, Status:
      1. Burn test at -85V (Xavier) 
        • passed  the burn test
      2. Getting the detector running in DAQ; (Alex)
      3. Take some copper fluorescence data (Zongde)
      4. Setup insatllation at MFX beam dump table, And check the fibers connection to the server; 
        • Date: 26th Aug(Monday)?
        • Moving forward to the beam table: Wed (28th) or Thur (29th) if possible
      5. Physical setup to secure the camera;
        • Will discuss with Chris Koerber
      6. Checking we have the multitosingle mode converter box;
      7. Testing the timing scan and trigger rate setting script;
        • Timing scan tested.  
        • Intensity scan should be same as before.
      8. Setting up the pre-setup meeting (include TID);
        • Beamtime week
      9. Get the measurement plan
        • The week before the beamtime;
      10. Schedule the staffing;
      11. Ensure we have the needed support;