Attendance:
Presentation:
Agenda/Notes:
- ePixM June 15th Beamtime Prep:
- Pre-setup meeting
- Setup deployed on Wednesday in MFX at beam dump location
- We can talk to the detector, LCLS dac works fine.
- will move the setup to the final position on Saturday, before the beamtime.
- Wave8 diodes need to be installed before the beamtime as well
- Detector Mask design
- Five mask designs ordered
- status
- Black kapton need to be stuck to the surface of mask
- Measurement plan and staffing
- Stuff to do:
- Look at crosstalk with softHI
Run 909 (Soft/Hi), (slice 10/10) (Xavier's plot on slack)
- mini-X tests in marrietta
- Status
- Look at crosstalk with softHI
- Basic script suite for beamtime
- Git training?