  1.  ePixM:
    1. Beamtime prep, Status off:
      1. Getting the detector running in DAQ;
      2. Getting the fibers installed at MFX and to server;
      3. Physical setup to secure the camera;
      4. Checking we have the multitosingle mode converter box;
      5. Cables and supplies to run the camera and what bias we need to apply
      6. Light shield to block visible light;
      7. Evaluate the data coming out of the detector;
      8. Testing the data analysis scripts and visualisations;
      9. Testing the timing scan and trigger rate setting script;
      10. Setting up the pre-setup meeting (include TID);
      11. Get the measurement list together;
      12. Schedule the staffing;
      13. Ensure we have the needed support;
      14. AMI-2