See https://confluence.slac.stanford.edu/display/MEC/L-10034+Tear-Down for photographs of in-vacuum cables.

Planned Schedule

Completed as of 8 April 2024:

  • Target
  • Beam Dump

9-11 April 2024:

  • Monochromator Translation
    • use F_XRTS MICOS XYZ cabling
  • Channel cut tip/tilt
    • Assign Newport channels 
    • 4 motors
  • Si (5 3 3 ) analyzers (H+V)
    • Assign IMS channels
    • 6 motors
  • Epix100 translation stage (vt50)
    • Assign IMS channels
    • 2 motors
  • Si (5 3 3) analyzer1 - Z axis (vt50)
    • Assign IMS channel
    • 1 motor

12 April 2024:

  • LPL Drive Lenses
    • Using existing cabling
    • 6 motors - Newport
  • VISAR Lens
    • Using existing cabling
    • 3 motors - Newport

Motor Checklist

PurposeBase PVConnectionpmgrpython deviceCabled?Homed?
Standard Motors
LPL Drive Lenses
East_XMEC:PPL:MMN:17T5/*1,  XPS 3/1, 

ioc-mec-ppl-xps3

Newporteast_x

East_YMEC:PPL:MMN:18T5/*2,  XPS 3/2, 

ioc-mec-ppl-xps3

Newporteast_y

East_ZMEC:PPL:MMN:19T5/*3, XPS 3/3,

ioc-mec-ppl-xps3

Newporteast_z

West_XMEC:PPL:MMN:20T5/*4, XPS 3/4, 

ioc-mec-ppl-xps3

Newportwest_x

West_YMEC:PPL:MMN:21T5/*5, XPS 3/5, 

ioc-mec-ppl-xps3

Newportwest_y

West_ZMEC:PPL:MMN:22T5/*6, XPS 3/6, 

ioc-mec-ppl-xps3

Newportwest_z

VISAR Lens
VISAR_X

MEC:PPL:MMN:32

VacCable 9, T6/DB25-1, AirCable "XPS DelayStage", XPS 4/8, ioc-mec-ppl-xps4

Newport visar_x

VISAR_Y

MEC:PPL:MMN:31

VacCable 2, T6/DB25-2, AirCable "XPS2 #4", XPS 4/7, ioc-mec-ppl-xps4Newportvisar_y

VISAR_Z

MEC:PPL:MMN:28

VacCable 10, T6/5, AirCable "XPS2 #3/XPS2 #1", XPS 4/3, ioc-mec-ppl-xps4

Newportvisar_z

Target
TC_hexapodIOC:MEC:HEX1B4/L8 Hexapod

pending ECS-4500 - Getting issue details... STATUS

Yes
Target_XMEC:USR:MMS:17

D2/D5

MF? moxa-mec-09:4001 (R62 E15), ioc-mec-usrppl-ims

PLS-85 Sample Starget_xYes



Beam Dump
Zyla_500mmMEC:PPL:MMN:08in-air to beam dump, XPS 1/8,

ioc-mec-ppl-xps1

Newportzyla_zYesYes

JJ Slits

Not in questionnaire

4 motors

JJ Slits

MEC:TC1:MMS:[17,18]

MEC:TC1:MMS:[01,02]

T5/2 and T5/8





Experiment Specific Motors

Fast Diode

Not in questionnaire

2 motors

Diode_ZMEC:PPL:MMN:29

VacCable 5, T6/7, AirCable "XPS3 #7", XPS 4/5,  ioc-mec-ppl-xps4

Newport diode_z

Diode_Y

MEC:PPL:MMN:30



VacCable 11, Flange B5, port B2, AirCable "XPS1 #4", XPS 4/6,  ioc-mec-ppl-xps4

Newport 

diode_y



Monochromator Translation

From questionnaire: Mono_[XYZ]

3 motors

Mono X

FXRTS_X

MEC:TC1:MMS:09

D2/D5

MF? digi-mec-07:2111 (R64A E19), ioc-mec-tc1-xuv-ims

XUV Xmono_x

Mono Y

FXRTS_Y

MEC:TC1:MMS:08

D2/D5

MF? digi-mec-07:2110 (R64A E19), ioc-mec-tc1-xuv-ims

XUV Ymono_y

Mono Z

FXRTS_Z

MEC:TC1:MMS:07

D2/D5

MF? digi-mec-07:2109 (R64A E19), ioc-mec-tc1-xuv-ims

XUV Zmono_z

Si (5 3 3) analyzers - Dumb Motors (H + V)

From questionnaire: Analyzer[123]_[HV]

6 motors


MEC:TC1:MMS:22

T5/5

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims






MEC:TC1:MMS:22

T5/5

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims






MEC:TC1:MMS:22

T5/5

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims






MEC:TC1:MMS:22

T5/5

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims






MEC:TC1:MMS:22

T5/5

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims






MEC:TC1:MMS:22

T5/5

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims





Si (5 3 3) analyzer1 - Z axis (VT 50)

From questionnaire: Analyzer1_Z

1 motors


MEC:TC1:MMS:22

T5/5

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims

VT-50-100block_z

Channel cut tip/tilt - Newport (H + V)

From questionnaire: Mono1_[HV], Mono2_[HV]

4 motors

Mono1_HMEC:TC1:MMS:22

T5/5

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims


mono1_h (tip/tilt)

Mono1_VMEC:TC1:MMS:22

T5/5

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims


mono1_v (tip/tilt)

Mono2_HMEC:TC1:MMS:22

T5/5

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims


mono2_h (tip/tilt)

Mono2_VMEC:TC1:MMS:22

T5/5

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims


mono2_v (tip/tilt)

ePix100 - Translation stage (VT50)

From questionnaire: Detector[12]_Z

2 motors

Detector1_ZMEC:TC1:MMS:22

T5/5

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims

VT-50-55detector1_z

Detector2_ZMEC:TC1:MMS:22

T5/5

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims

VT-50-55detector2_z

Channels used in Gregori L-10034

(Inventory of existing Newport and IMS cabling)

BXRTS_XMEC:PPL:MMN:07VacCable 7, B7/H3, AirCable "XPS2 #3", Patch Panel #7, XPS 1/7,

ioc-mec-ppl-xps1

Newport bxrts_x

BXRTS_YMEC:PPL:MMN:11VacCable (no label), B7/H2, AirCable (no label), Patch Panel #11, XPS 2/3,

ioc-mec-ppl-xps2

Newport bxrts_y
  • UTS Stage
  • DB15

BXRTS_ZMEC:PPL:MMN:16VacCable (no label), B7/H5, Air Cable "XPS2 #2", Patch Panel #16, XPS 2/8,

ioc-mec-ppl-xps2

Newport bxrts_z

Beam_blockMEC:TC1:MMS:22

T5/5

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims

VT-50-100block_z

Filter wheelMEC:USR:MMS:20

Flange/FF?

Cable #4





Detectors Checklist (TBD)

DetectorDAQ aliasConnectionCabled?In DAQ?
epix10k-540kquad_0

Fiber:

  • B2/#1,#2 
  • PR60 E15 Middle #1 
  • R62 E33 Right #2
  • MTP to daq-mec-pgp02
    • rear
    • upper right side
    • left most fiber port

Power: B3/Quad 0



epix10k-540kquad_2

Details worked out with Detectors Group.

Fiber:

  • B2/#7,#8
  • PR60 E15 Middle #4 
  • R62 E33 Right #2
  • MTP to daq-mec-pgp02
    • rear
    • upper right side
    • left most fiber port

Power: B3/Quad 3



epix10k-540kquad_3

Fiber:

  • B2/#7,#8
  • PR60 E15 Middle #4 
  • R62 E33 Right #2
  • MTP to daq-mec-pgp02
    • rear
    • upper right side
    • left most fiber port

Power: B3/Quad 3



ePix100epix100a_1_bxrts

Planned: Fiber pair from Flange D2d, power from the South epix-PDU feedthru on B3.

  • MTP to daq-mec-cam01


ePix100epix100a_2_fxrts

Planned: Fiber pair from Flange B2 Quad 2 (#5/#6), power from North epix-PDU feedthru on B3.

  • MTP to daq-mec-cam01


ePix100epix100a_0_xpcs

in-air

  • Dimitri created a dummy flange (add details)
  • MTP to daq-mec-cam01


Andor Zylazyla

in-air

USB/Fiber extender to daq-mec-cam02

YesYes
VISAR 1visar_1Network connection with Windows PC ioc-mec-visar1Yes

Yes

Not tested right now since under regular use

VISAR_2visar_2Network connection with WIndows PC ioc-mec-visar2Yes

Yes

Not tested right now since under regular use

Timing diode

PVs are:

  • MEC:QADC:01:CH{0,1,2,3}

B3

ioc-mec-qadc.

Timing fiber connected.

Diode signal into A1 with SMA/Male - SSMC/Female Coaxial Jumper Cable and VLM-83-2W-S+ limiter.

Yes

qadc134 IOC is running. Here is how to display:

PCIe Quad ADC Digitizer Boards (QADC and QADC134) - needs to be updated, see ECS-4919 - Getting issue details... STATUS .

27 March 2024: Diode is placed close to target during VISAR shots. Under test.


XRT spectrometerhxsssN/AN/A