See https://confluence.slac.stanford.edu/display/MEC/L-10034+Tear-Down for photographs of in-vacuum cables.

Also see "PR60 (EL 2/3) Stepper Motor Patch Panel" in 7.2. Rack map.

Planned Schedule

Completed as of 8 April 2024:

  • Target
  • Beam Dump

9-11 April 2024:

  • Monochromator Translation
    • use F_XRTS MICOS XYZ cabling
  • Channel cut tip/tilt
    • Assign Newport channels 
    • 4 motors
  • Si (5 3 3 ) analyzers (H+V)
    • Assign IMS channels
    • 6 motors
  • Epix100 translation stage (vt50)
    • Assign IMS channels
    • 2 motors
  • Si (5 3 3) analyzer1 - Z axis (vt50)
    • Assign IMS channel
    • 1 motor

12 April 2024:

  • LPL Drive Lenses
    • Using existing cabling
    • 6 motors - Newport
  • VISAR Lens
    • Using existing cabling
    • 3 motors - Newport

Newport Usage

XPS12345678
1Questar 1 HQuestar 1 VQuestar 2 HQuestar 2 VBED 2BED 1B_XRTS XZyla 500m
2

B_XRTS Y



B_XRTS Z
3East ZEast YEast XWest ZWest YWest X

Zyla 500m

IMS500PP - labeled "no connect"

Zyla 500m
4Mono2_H (E)Mono2_V (E)
VISAR Z

Diode Z

Mono1_V (W)

Diode X

Mono1_H (W)

VISAR YVISAR X

PR60 (EL 2/3) Stepper Motor Patch Panel - Proposed and As Implemented Use

Green marks the patch panel connections I propose to use (or repurpose) for the 6 Analyzer H/V IMS channels. This will avoid time spent in routing directly into distant racks.


Left (1)

(2)

(3)

(4)

(5)

(6)

(7)

Right (8)

Upper

MEC:USR:MMS:17

tgX

MEC:TC1:MMS:26

ePix100a backward

MEC:TC1:MMS:22

ePix100a forward

MEC:USR:MMS:20

Filter Wheel

Analyzer1_V

MEC:USR:MMS:21

Analyze_Z

MEC:USR:MMS:22

IMA Lens

MEC:USR:MMS:23

Not Used

Analyzer1_H

MEC:USR:MMS:24

Not Used

BAD!

Lower

MEC:USR:MMS:25

Talbot Y

Analyzer2_H

MEC:TC1:MMS:25

Turning Mirror L-R

MEC:USR:CLZ:01

Zyla Focus

Analyzer2_V

MEC:USR:CLF:01

Zyla Vert

Analyzer3_V

N/A

N/A

MEC:TC1:MMS:29

Turning Mirror U-D

MEC:TC1:MMS:23

Zyla Scint

Analyzer3_H

Motor Checklist

PurposeBase PVConnectionpmgrpython deviceCabled?Verified/Homed?
Standard Motors
LPL Drive Lenses
East_ZMEC:PPL:MMN:17T5/*1,  XPS 3/1, 

ioc-mec-ppl-xps3

Newporteast_zYesYes
East_YMEC:PPL:MMN:18T5/*2,  XPS 3/2, 

ioc-mec-ppl-xps3

Newporteast_yYesYes
East_XMEC:PPL:MMN:19T5/*3, XPS 3/3,

ioc-mec-ppl-xps3

Newporteast_xYesYes
West_ZMEC:PPL:MMN:20T5/*4, XPS 3/4, 

ioc-mec-ppl-xps3

Newportwest_zYesYes
West_YMEC:PPL:MMN:21T5/*5, XPS 3/5, 

ioc-mec-ppl-xps3

Newportwest_yYesYes
West_XMEC:PPL:MMN:22T5/*6, XPS 3/6, 

ioc-mec-ppl-xps3

Newportwest_xYesYes
VISAR Lens
VISAR_X

MEC:PPL:MMN:32

VacCable 9, T6/DB25-1, AirCable "XPS DelayStage", XPS 4/8, ioc-mec-ppl-xps4

Newport visar_xYesYes
VISAR_Y

MEC:PPL:MMN:31

VacCable 2, T6/DB25-2, AirCable "XPS2 #4", XPS 4/7, ioc-mec-ppl-xps4Newportvisar_yYesYes
VISAR_Z

MEC:PPL:MMN:28

VacCable 10, T6/5, AirCable "XPS2 #3/XPS2 #1", XPS 4/3, ioc-mec-ppl-xps4

Newportvisar_zYesYes
Target
TC_hexapodIOC:MEC:HEX1B4/L8 Hexapod

pending ECS-4500 - Getting issue details... STATUS

YesYes
Target_XMEC:USR:MMS:17

D2/D5

MF? moxa-mec-09:4001 (R62 E15), ioc-mec-usrppl-ims

PLS-85 Sample Starget_xYes

Yes


Beam Dump
Zyla_500mm

MEC:PPL:MMN:08

MEC:PPL:MMN:24

MEC:PPL:MMN:23

Now back to

MEC:PPL:MMN:24


in-air to beam dump, XPS 1/8,

ioc-mec-ppl-xps1

XPS 3/8, ioc-mec-ppl-xps3

Newportzyla_zYesYes

JJ Slits

Not in questionnaire

4 motors

JJ Slits

MEC:TC1:MMS:[17,18]

MEC:TC1:MMS:[01,02]

T5/2 and T5/8



YesYes
Experiment Specific Motors

Fast Diode

Not in questionnaire

2 motors

Diode_ZMEC:PPL:MMN:29

VacCable 5, T6/7, AirCable "XPS3 #7", XPS 4/5,  ioc-mec-ppl-xps4

Newport diode_z

Diode_Y

MEC:PPL:MMN:30



VacCable 11, Flange B5, port B2, AirCable "XPS1 #4", XPS 4/6,  ioc-mec-ppl-xps4

Newport 

diode_y



Monochromator Translation

From questionnaire: Mono_[XYZ]

3 motors: MECHome Spectrometer screen

Mono Z

FXRTS_X

MEC:TC1:MMS:09

D2/D5

MF? digi-mec-07:2111 (R64A E19), ioc-mec-tc1-xuv-ims

XUV Xmono_zYesYes: to LLS and HLS.

Mono Y

FXRTS_Y

MEC:TC1:MMS:08

D2/D5

MF? digi-mec-07:2110 (R64A E19), ioc-mec-tc1-xuv-ims

XUV Ymono_yYesYes: to LLS and HLS.

Mono X

FXRTS_Z

MEC:TC1:MMS:07

D2/D5

MF? digi-mec-07:2109 (R64A E19), ioc-mec-tc1-xuv-ims

XUV Zmono_xYesYes: to LLS and HLS.

Si (5 3 3) analyzers - Dumb Motors (H + V)

From questionnaire: Analyzer[123]_[HV]

6 motors

Analyzer1_HMEC:USR:MMS:23

T6/#1

Analyzer Cable #1


Original, unused: VT-50-100

New: Faulhber_SA_15_8_141 config (under MEC VT50) with encoders and limit switches disabled.

analyzer1_hYesYes
Analyzer1_VMEC:USR:MMS:20

T6/#1

Analyzer Cable #2


Original, unused: Micronix_VT50

New: Faulhber_SA_15_8_141 config (under MEC VT50) with encoders and limit switches disabled.

analyzer1_vYesYes
Analyzer2_HMEC:USR:MMS:25

T6/#2

Analyzer Cable #3

Repurposed "Talbot Y" PR 60 patch panel connection.

Original: PLS85 In-Air

New: Faulhber_SA_15_8_141 config (under MEC VT50) with encoders and limit switches disabled.

analyzer2_hYesYes
Analyzer2_VMEC:USR:CLZ:01

T6/#2

Analyzer Cable #4

Repurposed "Zyla Focus" PR 60 patch panel connection.

Original: Optique Peter Focus

New: Faulhber_SA_15_8_141 config (under MEC VT50) with encoders and limit switches disabled.

analyzer2_vYesYes
Analyzer3_VMEC:USR:CLF:01

D2c/D5 (verify feedthru)

Analyzer Cable #5

Repurposed "Zyla Vert" PR 60 patch panel connection.

Original: Optique Peter Vertical

New: Faulhber_SA_15_8_141 config (under MEC VT50) with encoders and limit switches disabled.

analyzer3_vYesYes
Analyzer3_HMEC:TC1:MMS:23

D2c/D5 (verify feedthru)

Analyzer Cable #6

Repurposed "Zyla Scint" PR 60 patch panel connection.

Original: Crystal Y

New: Faulhber_SA_15_8_141 config (under MEC VT50) with encoders and limit switches disabled.

analyzer3_hYesYes

Si (5 3 3) analyzer1 - Z axis (VT 50)

From questionnaire: Analyzer1_Z

1 motors

Analyzer1_ZMEC:USR:MMS:21

VacCable 6, T5/6

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims

VT-50-100analyzer1_zYesYes

Channel cut tip/tilt - Newport (H + V)

From questionnaire: Mono1_[HV], Mono2_[HV]

4 motors

Mono1_H (W)MEC:PPL:MMN:29

B5/B2 Newport 4 Port 4


mono1_h (tip/tilt)YesYes
Mono1_V (W)MEC:PPL:MMN:30

B5/B3 Newport 4 Port 5


mono1_v (tip/tilt)YesYes
Mono2_H (E)MEC:PPL:MMN:25

B5/B4 Newport 4 Port 1


mono2_h (tip/tilt)YesYes
Mono2_V (E)MEC:PPL:MMN:26

B5/B5 Newport 4 Port 2


mono2_v (tip/tilt)YesYes

ePix100 - Translation stage (VT50)

From questionnaire: Detector[12]_Z

2 motors

Detector1_Z

(Forward)

MEC:TC1:MMS:22

VacCable 5. T5/5

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims

VT-50-55epix100f_zYesTest lims.

Detector2_Z

(Backward)

MEC:TC1:MMS:26

VacCable 4, T5/4

MF? moxa-mec-09:4005 (R62 E15),  ioc-mec-tc1-vt50-ims

VT-50-55epix100b_zYesTest lims.

Detectors Checklist (TBD)

DetectorDAQ aliasConnectionCabled?In DAQ?
epix10k-540kquad_0
  • Power: Quad 0 vac cable -> Flange B3, Q0 feedthru -> air cable "epix10k quad 0" -> MPOD quad outlet 0
    • Note: vac cable labeled "PDU Cable Epix10k Q0" on quad side but "epix10k quad2" on flange side.
  • Fiber: using "epix10k quad 0" vacuum and air fibers. Flange B2, feedthru pair 0 -> PR60 patch panel quad port 0
YesYes
epix10k-540kquad_1
  • Power:  TBD -> Flange B3, Q2 feedthru -> air cable "epix10k quad 2" -> MPOD quad outlet 1
  • Fiber: using "epix10k quad 21 vacuum and air fibers. Flange B2, feedthru pair 2 -> PR60 patch panel quad port 2
  • Note on vacuum power cables:
    • Using cable "PDU Cable epix10k Q1": Minor alarm on DVDD when ON, HV error when failed to configure in the DAQ.
    • There is a second cable from Phil "epix10k quad 0" that I have not tested. It is on the optical table.
Fiber only, no power.No
epix10k-540kquad_3
  • Power:  Quad 3 vac cable -> Flange B3, Q3 feedthru -> air cable "C01 April 2024" -> MPOD quad outlet 3
  • Fiber: using "epix10k quad 3" vacuum and air fibers. Flange B2, feedthru pair 3 -> PR60 patch panel quad port 3
YesYes

ePix100

SW Epix100a

"epix100a_f"

  • Power: Flange B3, South feedthru -> power cable E1 -> MPOD outlet 1
  • Fiber: using "epix100a epix 1" vacuum and air fibers. Flange D2 (left) -> PR60 patch panel epix port 1 → MTP to daq-mec-cam01
  • MECHome: "Epix 1"
  • DAQ: "epix100a_1_bxrts"
YesYes

ePix100

NE Epix100a

"epix100a_b"

  • Power: Flange B3, North feedthru -> power cable E0 -> MPOD outlet 2
  • Fiber: using "epix100a epix 0" vacuum and air fibers. Flange D2 (upper) -> PR60 patch panel epix port 2 → MTP to daq-mec-cam01
  • MECHome: "Epix 2"
  • DAQ: "epix100a_2_fxrts"
YesYes
Andor Zylazyla

in-air

USB/Fiber extender to daq-mec-cam02

YesYes
VISAR 1visar_1Network connection with Windows PC ioc-mec-visar1Yes

Yes

Not tested right now since under regular use

VISAR_2visar_2Network connection with WIndows PC ioc-mec-visar2Yes

Yes

Not tested right now since under regular use

Diode/Wave8

PVs are: 

  •  MEC:XT2-1:BMMON:*
  •  MEC:XT2-2:BMMON:*
  • MEC:USR_DIO:)

TBD

Yes

Yes: see ECS-5105 - Getting issue details... STATUS .


Timing diode/QADC134

PVs are:

  • MEC:QADC:01:CH{0,1,2,3}

B3

ioc-mec-qadc.

Timing fiber connected.

Diode signal into A1 with SMA/Male - SSMC/Female Coaxial Jumper Cable and VLM-83-2W-S+ limiter.

Yes


Yes

XRT spectrometerhxsssN/AN/A