DAQ integration priority order determined together with Sebastien Boutet and hutch scientists

Meeting dates:

  • Nov. 20, 2023 with Sebastien/James/Georgi

Detectors:

  • rixccd (archon)
    • mostly complete
  • superconducting phase-cavity (close) and ebeam BLD for lcls2
  • small txi epixHR (beginning of 2025)
  • rix high-rate mono-encoder
    • mostly complete
  • UED 1080Hz epix
  • mfx jungfrau16M (a year)
  • tmo tixel (running standalone in february?)
    • magnetic bottle expts could use existing detector
    • would be nice to replace a dream delay-line-detector with tixel? need a larger one. not obligated to users
    • higher priority than big txi epixHR
    • could replace k-microscope delay-line detector
  • rix axis sxr-60 camera (chemrix spectrometer)
    • smaller pixel than epix
    • can't use andor: flange-mount makes grazing-incidence difficult
    • could happen before "the shutdown" (july 2025)
    • highest priority for new instrument for rixs experiments
    • plan is to implement as an IOC (who? dan? if tid could do it that would be great)
  • opal replacement (see Opal Replacement)
  • big txi epixHR (big one delayed until aug 2025)
  • rix epixM (depends on approved experiments)
  • rix k-microscope delay-line-detector (depends on approved experiments)
    • should we use the dream dld instead?
    • communicate with Bob Schoenlein
  • epixUHR (testing and in XPP, production not until late 2026)
  • ued andor ixon (the camera used in the old daq? but maybe not)
    • maybe an IOC because of long integration times
    • might not be too bad if it's an andor
    • get more information