You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Technical Path to DR and OPA Reviews

DateTaskLinkExperimental SystemsLaser SystemsConventional FacilitiesControls Systems









Worry List




Content for Presentations

Recommendations

CDR, CD-1 DR, CD-1 IPR 

FAC


  •  CDR/CD-1 Updated


  • Prelim. response entered


  •  CDR/CD-1 Updated


  • Prelim. response entered


  •  CDR/CD-1 Updated


  • Prelim. response entered


  •  CDR/CD-1 Updated


  • Prelim. response entered

Content for Presentations

Documentation List

  •  Docs updated
  •  Docs updated
  •  Docs updated
  •  Docs updated
8/31-9/25

Speakers Prepare Plenary and Breakout Presentations - Technical Content

Presentation Repository

Template

  •  Technical content complete
  •  Technical content complete
  •  Technical content complete
  •  Technical content complete
9/26-9/27

Insert Cost and Schedule Charts into DR presentations


  •  Cost/Schedule slides inserted
  •  Cost/Schedule slides inserted
  •  Cost/Schedule slides inserted
  •  Cost/Schedule slides inserted
9/27-9/28

Director's Review slide lay down (Internal - Plenaries )


  •  Lay down complete
  •  Lay down complete
  •  Lay down complete
  •  Lay down complete
10/2-10/6

Director's Review slide lay down (Internal - Breakouts)


  •  Lay down complete
  •  Lay down complete
  •  Lay down complete
  •  Lay down complete
10/12-10/13

Director's Review dry run (Internal, Plenaries and Breakouts, 2-day hybrid "open house")


  • Ready for dry run
  • Ready for dry run
  • Ready for dry run
  • Ready for dry run




  • No labels