Attendees:

Ginger DeContreras 

Robert Plummer

Selina Green 

Al Cook

Conder, Alan Dean 

Gilliss Dyer 

Tom Spinka 

Reagan, Brendan 

Steve Ritz 

Liz Hill

Cunningham, Eric Flint


Concept of Operations (ConOps)

TopicsNotes
ROD-013 - Ready for Approval?

Send for signatures.

Data Requirements (IFE)Jana unable to attend, postpone until next time.  Uncertain from a data standpoint (Gilliss).  Box 6, 7, 8 (below) are not advertised as part of the project and will need to understand requirements.  What's difficult to retrofit in at a later date?  Automated 'volley' of shots without user intervention.  Interfaces required?  At what point is definition required?  Where does parameter scan come from?  Do we have the right suite of diagnostics with interfaces to DAQ?  Latency in data storage, analysis and handling that may preclude changing configurations on a rapid basis?  LLNL - Conceptual level interface is important prior to design review in December.


  • No labels