Target Release Date  

Final edits due  

Introduction

HE update

Roles and Team update

Margaret Ghaly insert links to an "org chart" for all of HE controls. Need the PoCs for things identified.

MECU-update

Rack allocations

Other controls requirements

LLE+LLNL Visit

Hutch Python Update

Robert S. Tang-Kong Zachary L Lentz 

Position Lag Monitoring

  • Add metric plots
  • Add any conclusions drawn regarding this issue, and corrections.
  • Would be nice to see the counts trending down on account of some PLM threshold changes.

Zachary L Lentz Tyler Johnson 

Love for Lightpath

Robert S. Tang-Kong Zachary L Lentz 

New ECS PD Campaign: Code Review

Ken Lauer Robert S. Tang-Kong 

First Deployment of ATEF

Ken Lauer Zachary L Lentz 

QRIX Controls

Margaret Ghaly Jyoti, Joshi 


Spectrometer Arm.mp4


The Spectrometer Arm has been installed and checked out. The spectrometer arm has a total of 27 axes installed with coupled and coordinated motion with strict EPS requirements. The acceptance test went very well with Toyama and even were complete ahead of schedule.

The QRIX vacuum PLC code has been merged with that of the spectrometer arm. The vacuum controls integration is complete for all the installed devices.

TXI

Jyoti, Joshi 

Facility Monitoring System Update

Cynthia Melendrez Tyler Johnson 

Radiation Monitoring in the FEE

Waters, Nick 

X-ray Optics Controls Updates

Waters, Nick 

CSU Chico Capstone Collaboration

Alex Wallace 