Deploy coating protection logic for FEE HOMS on the L line.
Optics lib
https://github.com/pcdshub/lcls-twincat-optics/pull/10
lfe-optics
https://github.com/pcdshub/lcls-plc-lfe-optics/pull/19
lfe-arbiter
https://github.com/pcdshub/lcls-plc-lfe-arbiter
Verified Ni fault occurred simulating 500eV:
Moved mirrors to B4C strip and verified, the Ni fault could clear and B4C also could clear
Adjusted eV to 14000, no fault, then to 14001 and produced the B4C fault: