    • Instructions from Kaz:
      1). Mount the detector using a black adapter plate.  Detector connected to the adapter
      plate using only 2 screws (not all 4). (In fact, do we even need the adapter plate?) Done. Note: supplied adapter plate does not match mounting pattern in detector case.  Need to find alternate plate.
      2). Prepare water chiller
      - Disconnect water chiller from network (if it's connected). Done.
      - Prime the water chiller using the short hose (in the FAR hall detector cabinet 
      lock key is 0624).  Run the pump at 100%, 50%, and 10%, 10minutes at each setting. (Done)
          15% = 2.8 l/m
          50% = 3.4 l/m
        100% = 4.4 l/m
      - Reconnect water chiller to network. (Done)
      - connect water chiller to detector, and start running.  Flow should be ~2.4LPM. (2.5l/m) (Done)
      3). epix10k2m power  
      - attach power cables to PDU...label cables if necessary.  (Done).  Do not attach to 
      epix10k2m yet.
      - pin-out the epix10k2m power cables (Done, values below).

       

      Quad0Line

       

      MPOD CH
      A-MAVDD1V100
      B-NAVDD1V100
      C-PAVDD1V100
      D-RAVDDsense0V 
      E-SDVDD1.5V101
      F-GDVDDsense0V 
      U-VHV10V0

       

      Quad1

         
      A-MAVDD2V102
      B-NAVDD2V102
      C-PAVDD2V102
      D-RAVDDsense0V 
      E-SDVDD2.5V103
      F-GDVDDsense0V 
      U-VHV20V1

       

      Quad2

         
      A-MAVDD3V104
      B-NAVDD3V104
      C-PAVDD3V104
      D-RAVDDsense0V 
      E-SDVDD3.5V105
      F-GDVDDsense0V 
      U-VHV30V2
      Quad3   
      A-MAVDD4V106
      B-NAVDD4V106
      C-PAVDD4V106
      D-RAVDDsense0V 
      E-SDVDD4.5V107
      F-GDVDDsense0V 
      U-VUV403

       

      - if pin-out is ok, turn off power, and connect cables to detector. (done)
      - If water is flowing, turn on power.  Holding off on this since there is no fiber available to let us know whether the detector is working.

    Notes:
  • Detector bolted to stand just out of x-ray beam per Chollet instruction.  To be positioned later.
  • 15 ft. ePix Quad cables labelled and connected.
  • Chiller loop short-circuited, run @18C and 15% power for ~10 min.  Had to refill water to eliminate bubbles....seemed easier to get rid of bubbles with reservoir cap removed/loose.

 

 

Checkout August 7:

  • Detector mounted to motorized stage, powered up nominally at 0845.  Allow 15 min to stabilize.
  • Failed 'epix10k_pedestals' script.  Detector looks good in AMI (considering no peds).
  • ~0930 Q1 tripped....reset with wider env limits.
  • Silke thinks pedestal script is fixed...'epix10_pedestals', then 'makepeds' to load.  Seems good.  Check timing first.
  • Move integration window via acqToasicRDDelay (1 unit = 10ns).  Started ~78032, verified off at 68032, so good @78k.
  • Ag behenate, all five gain settings.  No attenuation.  Hi/Lo gain autorange is no good.  Quad 1 is way off.
  • Set fixed high, make new pedestal, record ring shape for geometry.
  • While checking motion limits to adjust ring coverage, we handed off the beam to AD and they were unable to return it for a couple of hours....
  • Record voltage/currents:
          •  

             

            ChannelLineVI
            oHV0200.000V0.000A
            1HV1200.0000.000
            2HV2200.0040.000
            3HV3200.0010.000
            100AVDD06.0064.314
            101DVDD06.0011.484
            102AVDD16.0024.278
            103DVDD16.0001.488
            104AVDD26.0044.276
            105DVDD26.0001.506
            106AVDD36.0024.276
            107DVDD36.0001.541

 

  • No labels