    • Instructions from Kaz:
      - Mount the detector using a black adapter plate.  Detector connected to the adapter
      plate using only 2 screws (not all 4). (In fact, do we even need the adapter plate?) Done.
      - Prepare water chiller
      - Disconnect water chiller from network (if it's connected). Done.
      - Prime the water chiller using the short hose (in the FAR hall detector cabinet 
      lock key is 0624).  Run the pump at 100%, 50%, and 10%, 10minutes at each setting. (Done)
          15% = 2.8 l/m
          50% = 3.4 l/m
        100% = 4.4 l/m
      - Reconnect water chiller to network.
      - connect water chiller to detector, and start running.  Flow should be ~2.4LPM.
      - epix10k2m power
      - attach power cables to PDU...label cables if necessary.  Do not attach to 
      epix10k2m yet.
      - pin-out the epix10k2m power cables.

       

      Quad0   
      A-M 1V 
      B-N 1V 
      C-P 1V 
      D-R 0V 
      E-S 1.5V 
      F-G 0V 
      U-V 10V 

       

      Quad1

         
      A-M 2V 
      B-N 2V 
      C-P 2V 
      D-R 0V 
      E-S 2.5V 
      F-G 0V 
      U-V 20V 

       

      Quad2

         
      A-M 3V 
      B-N 3V 
      C-P 3V 
      D-R 0V 
      E-S 3.5V 
      F-G 0V 
      U-V 30V 
      Quad3   
      A-M 4V 
      B-N 4V 
      C-P 4V 
      D-R 0V 
      E-S 4.5V 
      F-G 0V 
      U-V 40 

       

      - if pin-out is ok, turn off power, and connect cables to detector.
      - If water is flowing, turn on power.
  • Detector bolted to stand just out of x-ray beam per Chollet instruction.  To be positioned later.
  • Cables between MPOD and PDU connected.
  • 15 ft. ePix Quad cables labelled and connected.
  • Chiller loop short-circuited, run @18C and 15% power for ~10 min.
  • No labels