You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Table of Contents

Systems Engineering Timeline

DateEventStatusResponsibleComments/Issues 
Thur, Jul 30thRequirement Slide Template for L2's Kurita, LawrenceCreate a first cut for the L2s - create template slide after Friday flowdown call (Kurita) 
Fri, Jul 31 (TBD)SE & Risk Slides for PD Kurita, AkeribSE summary slides; Risk Slides for PD and L2s, DRM meeting being scheduled 
Fri, Aug 5 (TBD)Requirement Slides for L2s Kurita, Guarino, Besuner

Create a first cut for the L2s - create template slide after Friday flowdown call (Kurita)

 
Fri, Aug 5 (TBD)PBD verification Kurita, LawrenceCharles, Nadine - Meeting being scheduled with detector group and J. Ruhl. Currently the PBD has not been validated by sims and is on-going. 
Fri, Aug 5 (TBD)Risk Slides for L2s Kurita, Akerib  
Fri, Aug 5 (TBD)ICD slides Grudzinski, Besuner Just show the template and a couple good examples. 
TBDPlenary Dry Run  SE to provide slides to management; requirements and risks 
TBDBreakout Dry Runs Kurita, Besuner  
Tue, Aug 4Post Plenary Talks  SE to provide any updates for Jim's talk 
Tue, Aug 11 (TBD)Post Breakout Talks Kurita  
Tue, Aug 11 (TBD)Review Support Documents Posted see CD-1 Deliverables  
Tue, Aug 4Key Deliverables Posted    
Tue, Aug 18Review Starts    

 

Link to Talks

SE L2 Slides

SE PD Slides - need to create

SE Breakout Talk

 

Deliverables:  See CD-1 deliverables

 

  • No labels