- Set and status planning activities for detector development and deployment.
Discussion items
Time | Item | Who | Notes |
---|
30 min | Deployment 2-wk plan | KP | Plans to support upcoming experiments |
30 min | Status | All | - Not moving to Stage 1 today. SIP modified but not lifted.
- Lab population up to ~375 this week under 'Stage 0'.
- B84/B33 JSAs somewhere in TID approval cycle.
- ePix Quads FDR later this week.
- ICD review with NEH 2.2 this week.
- Chiller instability status after weekend run.
- Stress-test test of JF @CXI.
- ePix10k2M calibration/communication status. Escaclate?
- Jungfrau 4M calibration/commissioning plan.
- Priorities:
- JF Stress test.
- ePix10k setup, calibration.
- Calibrations/procedure developments for detector deployments, starting with ePix.
- Wave8 readiness.
- BIO for racks in chase.
- Seismic table mount components received.
- RA: Silke help with scheduling interns...
- Need help with test plan and verification of J-Box plans for install.
- PH: Collaboration meeting in ABQ....
- Writing RIXS Talk. Submitted two in-house proposals...one on TID sensors, one on UXI@MEC
- Calibration discussions w/ KP.
- Cable drawing standards have been changed....need updates?
- KN:
- Need to get Mike and Dan talking to the JF kit...IoC on top of PSI script
- eGun installed in Marietta....need to buy HiCube 80.
- All JF4M Cables are in. Making second umbilical?
- MPOD cables ....need Hi-V cables for ASC and MFX....follow up with Lupe.
- KP:
- Working procedures/calibration with Philip.
- Working docs with Silke for online access.
|
5 min | Budget Update | mmck | - M&S Status (Through December)
- Labor snapshot (Dec. actuals):
|
15 min | Review ASC First Projects | all | Coordinate/update lab schedule. |
10 min | Any other business | | |
Action items
- Action: Kazutaka Nakahara to circulate and/or post chiller manual to confluence.
- Action: Kazutaka Nakahara to run chiller over weekend to check stability, IOC performance.
- Action: Group to review ePix cal/comm status on Monday’s call and need for escalation.
- Action: Conny Hansson to look through Philip’s checklists to refine a written JF commissioning plan.
- Action: Zimmerman, Kayla to provide update on the e-gun/RP JSA approval status.
- Action: Zimmerman, Kayla to write up a draft epix10k deployment JSA, based on step-by-step.