You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
« Previous
Version 25
Next »
- Validate Detached Vertex Fixes Mathew Graham Miriam Diamond
- Finalize target z position Norman Graf
- Reassess ECAL alignment with latest SVT alignment? Unknown User (spaul)
- Update 2015 steering files for separate ECAL time calibration Unknown User (hszumila)
- Review and approve EngineeringRun2015FullRecon.lcsim steering file Norman Graf
- Propose setting _patchVertexTrackParameters to false in HpsReconParticleDriver
- Propose exposing the beam spot and target position and beam spot resolution in the steering file (different for 2015 and 2016)
- Propose limiting track collection to GBL tracks (remove MatchedTracks)
- Software Releases