This list contains the action items for the IEPM-BW group and is to be used to determine the tasks and progress of IEPM-BW members. Members are expected to keep their tasks up-to-date and current.

An archive of the task list, as standing after our group meeting, is also kept for reference.Key

Key

Item is

Description

underscored

Awaits something; provide a description of the cause and also provide the date from which it has been waiting at the end of the task description

strikesthru'd

Task is complete or has been dropped; if dropped, provide a reason. Also provide a complete date after the task, or 'dropped' if appropiate

bold

Task is currently being worked on or is actively being discussed

The general format of each task shall be represented as such:

  1. Project 1 - <Task Manager>
    1. Task 1 - <Person(s) responsible>
      1. Minor task 1 - <Person(s) responsible>
      2. Minor task 2 - <Person(s) responsible> - [DROPPED due to lack of interest]
    2. Task 2 - <Person(s) responsible>
  2. Project 2 - <Task Manager>
    1. Task 1 - <Person(s) responsible> [DONE 20060901]
    2. Task 2 - <Person(s) responsible> [AWAITING email contact back from Bob Smith]

Completed items must only be striked through rather than removed. These items will then be removed after each face-to-face meeting when the archive is updated.

Action Items

Terapaths Netflow (see http://iepmbw.bnl.gov/netflow/index.html) - Yee

  1. Get security requirements from SLAC/John H (Yee will talk to Gary 11/14/06) - Yee
  2. Presentation/Front-End - Yee
    1. Reimplement spider and pie charts for SVG::TT - Shahryar, Yee
      1. Implement pie chart class in SVG::TT - Shahryar, Yee
      2. Implement spider class in SVG/Template format - Shahryar, Yee
      3. Tidy up legends for pie and spider charts - Shahryar, Yee
    2. Fix labels on time series plots - Yee [DONE 20061019]

  3. Processing Back-End - Yee, Akbar
    1. Factorise out TopN code in JKFlow.pm (to do 11/14/06) - Akbar
    2. Refactorise JKFlow code for QoS analysis (restructure file structure and possibly QoS analysis) - Akbar
    3. Technical Documentation - Akbar
  4. Testing and Installation - Yee, Akbar
    1. Finalise installation script - Akbar, Yee
      1. Add patching - need distribution mechanism for tarball storage - Yee, Akbar
      2. Test perl prefix installations - Akbar, Yee [done 20060905]

    2. Add UI/cgi code to installation - Akbar, Yee
    3. Try out installation on fresh machine at SLAC

Transport services evaluation - Yee

  1. Work with Microsoft - Yee, Les
    1. Get latest privates from Microsoft
    2. Decide what is needed for stage 2
    3. Install Vista/Longhorn (Windows Vista does not install 11/14/06) - Yee
  2. NDT server at SLAC (see http://nettest5:7123) - Yee
    1. Installed on nettest5 NDT Install - Yee [DONE 20060831]

    2. Talk security into allowing public access - Yee.

PingER

Redesign and Implement Guthrie to cover both IEPM and PingER

IEPM-BW

  1. Work with DESY to get new monitoring host  (Jerrod will read Connie' documentation and see if he can accomplish this, adding to the documentation as he goes along) - Jerrod
  2. Make RAL a remote node
    1. Have account but cannot ssh to it (sent email to tasker 9/8/06) - Les
  3. Make FZK an IEPM Monitoring node - Connie - DONE
    1. Get contact for Connie (sent email 8/22/06, now awaits Connie) - DOME
  4. Update metrics used
    1. ID and add more targets for pathload - Connie - NOTE: pathload is problematical.
  5. Get distribution kit for iepm monitoring nodes to install & configure (Done adding owamp to the installkit as requested 10/3/06) - Jerrod
    1. Update pre-reqs document - Jerrod
  6. Add LHC Atlas hosts to IEPM-BW (list sent to Jerrod 9/6/06, added needs testing 9/6/06) [Done 9/8/06] - Jerrod, Les, Connie

  7. Add group for US-ATLAS [Done 9/20/06] -  Connie

  8. Diagnose orphan sockets problem - Connie - IN PROGRESS 11/15/06
  9. Get architecture of remote nodes and create a web page (wil get back to in Sept 06) - Jerrod
  10. Write script to use ssh to get the configurations of IEPM monitor and remote hosts (in progress 4/26/06, will revisit Sep '06) - Jerrod
  11. Do we want to get reverse traceroutes (at least where we have reverse traceroute servers, awaits time) - Connie
  12. Fix up TCP receive buffer sizes, add sanity checks - needs root on target hosts, which we do not have - (question)
  13. Bugs:

Traceanal Modularisation - Yee, Asif

  1. Integrate new topology into web server - awaits wan-mon appropoval - Yee
  2. Rendering of topology much slower on www.slac.stanford.edu - likely to be related to the web server, not code, as it runs quickly elsewhere (awaits WANMON web server, see below) - Yee
  3. Traceroute_analysis - Asif, Yee
    1. Prepare distributable version of traceanal - Asif, Yee
    2. Tidy up presentation - Asif
    3. Profile code for speed improvements - Asif, Yee
    4. Provide example of how to allow integration into Non-IEPM-BW data sets - Asif, Yee
    5. Update all Test_cases -Asif, Yee

IEPM-BW Ping Visualization - Les, Asif

  1. Update Traceanal Modular code to gather and visualize IEPM ping data - Asif [BASE Code DONE 20061116: Rest will be assigned to student at NIIT]

Alerts and Diagnosis - Les, Yee

  1. Look at multivariate event detection (collect data for SLAC, BNL, Caltech pathchirp, thrulay,ping) - Adnan
  2. Look at improvements to plateau (Yee plans a rewrite)
    1. Ability to find step ups - Yee
    2. Extend to allow up & down then compare down with original - Adnan
    3. Allow for small number of samples (e.g. at start) -
  3. Look at other detection algorithms and compare - Akbar
    1. Holt-Winters - Les, Mahesh, Felipe
      1. Go back 7 weeks -
      2. Check unusual results -
      3. Consider other ways to optimize parameters -
    2. Neural networks, Bayesian ...
  4. Prepare table of canonical events and how various algorithms react - Adnan
    1. Build case studies of email event (see https://confluence.slac.stanford.edu/display/IEPM/Anomaly+Case+Studies)  - Adnan
  5. Look at detecting outages for ping - Connie
    1. Analyze what constitutes a significant outage  - Connie
  6. Understand cause of delayed alerts and see if can improve - Connie - fixed - done Connie

Install WANMON as IEPM web server - Yee

  1. Install machine (awaits SCCS to install Dell host, Yee will track down 11/14/06)
  2. Get traceroute.pl and pingtable.pl working and in production (will be via John B. as they will be maintaining it) - Yee

PerfSONAR - Yee

  1. IEPM-BW Web Services - Yee, Asif
    1. -Measurement Archive Service for IEPM-BW data - Yee [DONE 20061110]

      1. Install SQL-MA* info*- Yee [STALLED due to complexity of Java instalaltion and code base compared to Perl]

        1. Write Ibatis configs for IEPM-BW data - Asif
  2. NMWG requirements? - Yee

Presentations/Talks/Visits/Papers/Documentation

IPv6

  • No labels