You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 44 Next »

Hybrid #

Received

Passive Components Loaded / Cleaned

Sent to UCSC

APV25s Loaded

Wirebonded

Tested

Results

Sent to SLAC

Glued to Carbon Fiber

Part of Half-Module

Notes

L4-L6 hybrid 1

02/11/2014

02/20/2014 (LS)

02/21/2014 (PH/HS)

02/21/2014 (FM)

02/24/2014 (FM)

 02/24/2014 (OM)

Baseline and Response (OM)  

02/25/2014 (VF/PH)

 

 

The temperature sensor was found to be faulty on 04/23/2014 (RH).

The R90 0Ohm resistor was added 5/8/2014 (PH).

L4-L6 hybrid 202/11/201402/20/2014 (LS)02/21/2014 (PH/HS) 02/21/2014 (FM) 02/24/2014 (FM) 02/24/2014 (OM)

Baseline and Response (OM)

02/25/2014 (VF/PH)

  

Channels 509, 510, 511 have low response and are likely caused by lifted corner on the APV. The hybrid was sent back to UCSC on 03/02/2014 (VF/PH) so the damaged APV could be replaced.

The high density connector was found broken at SLAC on 04/24/2014 (PH).

Need R90 rework. 

L4-L6 hybrid 302/11/201402/24/2014 (LS)02/25/2014 (PH/HS)02/26/2014 (FM)02/27/2014 (FM)02/27/2014 (OM/TO)Baseline and Response (OM)03/02/2014 (VF/PH)03/10/2014 (TKN)L4-L6 half-module 0 Need R90 rework. 
L4-L6 hybrid 402/11/201402/24/2014 (LS)02/25/2014 (PH/HS)02/26/2014 (FM)02/27/2014 (FM)02/27/2014 (OM/TO)Baseline and Response (OM)03/02/2014 (VF/PH)03/10/2014 (TKN)L4-L6 half-module 0 Need R90 rework. 
L4-L6 hybrid 502/11/201402/24/2014 (LS)02/25/2014 (PH/HS)Rejected (FM)       
L4-L6 hybrid 602/11/201403/24/2014 (LS)03/24/2014 (TKN/VF)03/25/2014 (FM) 03/26/2014 (FM)03/26/2014 (OM)Baseline and Response (OM)03/26/2014 (VF/PH)03/27/2014 (TKN)L4-L6 half-module 1Need R90 rework. 
L4-L6 hybrid 702/11/201403/24/2014 (LS)03/24/2014 (TKN/VF)03/25/2014 (FM) 03/26/2014 (FM)03/26/2014 (OM)Baseline and Response (OM)03/26/2014 (VF/PH)03/27/2014 (TKN)L4-L6 half-module 1Need R90 rework. 
L4-L6 hybrid 802/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 03/25/2014 (FM)03/26/2014 (FM)03/26/2014 (OM)

Baseline and Response (OM)

03/26/2014 (VF/PH)  The high density connector needs to be potted.

R90 reworked 5/12/2014. No flux UHV solder used, not pretty but connection is there (PH).
L4-L6 hybrid 902/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 04/28/2014 (FM)04/29/2014 (FM)04/29/2014 (OM)

Baseline and Response (OM)

04/29/2014 (OM)04/30/2014 (TKN)L4-L6 half-module 2Need R90 rework. 
L4-L6 hybrid 10 02/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 04/28/2014 (FM)04/29/2014 (FM)04/29/2014 (OM)

Baseline and Response (OM)

04/29/2014 (OM)04/30/2014 (TKN)L4-L6 half-module 2Need R90 rework. 
L4-L6 hybrid 1102/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 05/01/2014 (FM)05/02/2014 (FM)05/02/2014 (TO/OM) 05/02/2014 (OM)05/06/2014 (TKN)L4-L6 half-module 3Need R90 rework. 
L4-L6 hybrid 1202/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 05/01/2014 (FM)05/02/2014 (FM)05/02/2014 (TO/OM) 05/02/2014 (OM)05/06/2014 (TKN)L4-L6 half-module 3Need R90 rework. 
L4-L6 hybrid 1302/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 05/01/2014 (FM)05/02/2014 (FM)05/02/2014 (TO/OM) 05/02/2014 (OM)05/06/2014 (PH)L4-L6 half-module 4Need R90 rework. 
L4-L6 hybrid 1402/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 05/01/2014 (FM)05/02/2014 (FM)05/02/2014 (TO/OM) 05/02/2014 (OM)05/06/2014 (PH)L4-L6 half-module 4Need R90 rework. 
L4-L6 hybrid 1502/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 05/01/2014 (FM)05/02/2014 (FM)05/02/2014 (TO/OM) 05/02/2014 (OM)05/15/2014 (TKN)L4-L6 half-module 7R90 reworked 5/15/14 (PH).
L4-L6 hybrid 1602/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 05/01/2014 (FM)05/02/2014 (FM)05/02/2014 (TO/OM) 05/02/2014 (OM)05/15/2014 (TKN)L4-L6 half-module 7R90 reworked 5/15/14 (PH).
L4-L6 hybrid 1702/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 05/11/2014 (FM)05/12/2014 (FM)05/12/2014 (OM) 05/13/2014 (VF/PH)05/13/2014 (TKN)L4-L6 half-module 5 
L4-L6 hybrid 1802/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 05/11/2014 (FM)05/12/2014 (FM)05/12/2014 (OM) 05/13/2014 (VF/PH)05/13/2014 (TKN)L4-L6 half-module 5 
L4-L6 hybrid 1902/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 05/11/2014 (FM)05/12/2014 (FM)05/12/2014 (OM) 05/13/2014 (VF/PH)05/13/2014 (PH)L4-L6 half-module 6 
L4-L6 hybrid 2002/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 05/11/2014 (FM)05/12/2014 (FM)05/12/2014 (OM) 05/13/2014 (VF/PH)05/13/2014 (PH)L4-L6 half-module 6 
L4-L6 hybrid 2102/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 05/11/2014 (FM)05/12/2014 (FM)05/12/2014 (OM) 05/13/2014 (VF/PH)05/15/2014 (PH)L4-L6 half-module 8 
L4-L6 hybrid 2202/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 05/11/2014 (FM)05/12/2014 (FM)05/12/2014 (OM) 05/13/2014 (VF/PH)05/15/2014 (PH)L4-L6 half-module 8 
L4-L6 hybrid 2302/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 05/14/2014 (FM)05/15/2014 (FM)05/15/2014 (TO)     
L4-L6 hybrid 2402/11/201403/24/2014 (LS)03/24/2014 (TKN/VF) 05/14/2014 (FM)05/15/2014 (FM)05/15/2014 (TO)Bad Hybrid05/18/2014 (VF/TKN)  Hybrid baseline and response look choppy. Further testing is needed to determine what may be causing the issues.
L4-L6 hybrid 2502/11/201403/24/2014 (LS)03/24/2014 (TKN/VF)05/29/2014 (FM)05/30/2014 (FM)05/30/2014 (TO) 06/01/2014 (VF/PH)   
L4-L6 hybrid 26  05/28/2014 (TKN/VF)05/29/2014 (FM)05/30/2014 (FM)05/30/2014 (TO) 06/01/2014 (VF/PH)  The gain of calibration group 1 is higher than the rest of groups. However, the response for these channels looks fine.
L4-L6 hybrid 27  05/28/2014 (TKN/VF)        
L4-L6 hybrid 28  05/28/2014 (TKN/VF)        
L4-L6 hybrid 29  05/28/2014 (TKN/VF)        
L4-L6 hybrid 30  05/28/2014 (TKN/VF)        
L4-L6 hybrid 31  05/28/2014 (TKN/VF)        

Hybrid Documentation (schematics, layout, etc.)

HPS Hybrid Confluence Page

  • No labels