Program for swing 7/8 and night 8/8
Restart after PS injection septum replacement
particle |
energy |
trigger |
events |
notes |
---|---|---|---|---|
CR |
- |
self |
|
before beam, scan ACD veto threshold and verify MIP peak position |
e |
5 |
S0+S2+C1+C2 |
10K |
reference after restart to check pileup; get 10KHz on S0 and monitor num hits and energy in CAL to verify reduction of pileup |
e |
3 |
S0+S1+S2+C1+C2 |
10K |
synchronized with AD; check beam size, divergence, trigger rate vs S0 trigger, determine slits aperture to maximize readout rate in sync mode |
e |
3 |
S1+S2+C1+C2 |
10K |
synchronized with AD; check beam size, divergence, trigger rate vs S0 trigger, determine slits aperture to maximize readout rate in sync mode |
e |
3 |
S0+S2+C1+C2+ |
10K |
tagger alignment Si1, Si2, CU, e fraction |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5GeV e reference run with same conditions as before shu