Program for swing 7/8 and night 8/8
Restart after PS injection septum replacement
particle |
energy |
trigger |
notes |
---|---|---|---|
CR |
- |
self |
before beam, scan ACD veto threshold and verify MIP peak position |
e |
5 |
S0+C1+C2 |
reference after restart to check pileup; get 10KHz on S0 and monitor num hits and energy in CAL to verify reduction of pileup |
e |
3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5GeV e reference run with same conditions as before shu