 This is a list of steps to be followed while on shift. Please note that when we change configurations some of the reference plots may also change

Status from Previous Shift

Read Logbook comments from Runs Database  and the new shift log that allows one to include pictures and paper logbook

Ask people on shift if tehre is something else to be done

  • any bugs?
  • did all runs go through the pipeline? (expert wil help you to use this link)
  • have reports and data analysis files been produced?
  • do we need to inform experts of something taht may have happened?

Check Summary plots

Tasks Scheduled for this shift

List of Schedulked Tasks

Do you know who to call in case of trouble during your shift?

Locate On-call Expert List

Hardware Status

Familiarize yourself with the PS Control Room 

Verify Trigger Hardware Status

  • Internal versus External
  • Scintilattors are part of the trigger?
  • Which combination of triggers is being used? 

Verify Ancillary Detector Hardware Status

Verify DAQ/Online Status

  • Is Housekeeping running on BTServer (desktop4)?
  • Is elogbook running on  BTServer (desktop2)?
  • Is RunControl running on  BTServer (desktop1)?

Verify CU Hardware Status

  • Check pressure , temperature and humidity in the CU from PCGlast22** click on button labeled Power Supply on the left of the screen
  • Check 28 Volts in the CU from PCGlast22. Current expected ~ 2.6 A
    • click on tab labeled Agilent on the bottom center of the screen
  • Check Housekeeping in the CU from BTServer Screen 2** click desktop 4 on BTServer screen 1 

 

Verify Network Hardware Status

Experimental Set-up

Set Table in the Correct Position using this document. Details about the table can be found here

Tune Beam

Start and Stop a Run

Check Beam Status 

Start a run

End a run

Online Monitoring

Check GLAST Online Monitoring Pages

  • GLobal
  • Trenidng
  • ACD Page
  • Ancillary 1  page
  • Ancillary 2  Page
  • Ancillary Detail  Page
  • Statistics Page
  • Check TKR, CAl and Statisctics Pages  for TEM 1, 2, and 3 
  • Check the trigger counting rate

Offline Monitoring

 

Data Taking Configurations

In the

Predictions from MC Simulations

In the

Tune the Beam - Expert

 Nice 