 This is a list of steps to be followed while on shift. Please note that when we change configurations some of the reference plots may also change

Status from Previous Shift

Read Logbook comments from Runs Database  and the new shift log that allows one to include pictures and paper logbook

Evaluate if there are actions pending

  • any bugs?
  • did all runs go through the pipeline?
  • have reports and data analysis files been produced?
  • do we need to inform experts of something taht may have happened?

Check Summary plots

Tasks Scheduled for this shift

List of Schedulked Tasks

Locate On-call  Expert List

Hardware Status

Verify Trigger Hardware Status

Verify Ancillary Detector Hardware Status

Verify CU Hardware Status

Verify Network Hardware Status

Experimental Set-up

Set Table in the Correct Position using this document. Details about the table can be found here

Tune Beam

Start and Stop a Run

Check Beam Status 

Start a run

End a run

Online Monitoring

Check GLAST Online Monitoring Pages

  • GLobal
  • Trenidng
  • ACD Page
  • Ancillary 1  page
  • Ancillary 2  Page
  • Ancillary Detail  Page
  • Statistics Page
  • Check TKR, CAl and Statisctics Pages  for TEM 1, 2, and 3 
  • Check the trigger counting rate

Offline Monitoring

 

Data Taking Configurations

In the

Predictions from MC Simulations

In the

Tune the Beam - Expert

 Nice 