You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 25 Next »

Documentation:

 

Test Run 2012

HPS 2014/L4-6 hybrid

Hybrid schematics

draft , final

board-page, LTspice (9/2/13)

Hybrid Layout

draft , final

drawings for Tung (pdf), summary (dxf), all layers (pdf), old bonding geometry (pdf), new bonding geometry (pdf)

PADS

final

PADS ascii

 

L4-6 Hybrid meeting 8/14/13

  • No labels