A place to track projections for hardware going into Building 50 - for power, space and cooling planning purposes.

FY13 Projection

Fermi

$600k Options include

  • replacing 2 Oracle servers
  • 35 nodes to go into the general queues
  • potentially another 400 TB disk
  • unknown amount of tape (5 TB?)
BABAR
ATLAS
LSST
EXO
CDMS
HEP Theory
LCD

Mid FY12 Update

Fermi

$500k left to spend in CY12. Options include

  • replacing 25 glastlnx standalone servers (with perhaps 8 beefier ones)
  • contribute $35k for 2 5 TB tape drives
  • 35 nodes to go into the general queues
  • potentially another 400 TB disk
  • unknown amount of tape (1 vs 5 TB?)
BABAR
  • $35k for 2 5 TB tape drives
  • 20 nodes added to LTDA
  • line card for the LTDA switch, and new Etherite for the serial consoles
ATLAS
  • 2 cabinets of mostly storage
LSST
  • ?
EXO

Hoping for the following. Not sure how much of the disk money is really left due to other EXO expenditures.

  • $32k for disk
  • $20k for standalone linux servers
  • $5k tapes
KIPAC
  • replace interactive login servers ki-ls01-06
CDMS
  • $16k for disk, but would prefer buying in to a shared storage solution
HEP Theory
  • 24 TB disk hoped for
LCD
  • 1 Dell R610 for grid access to their fileserver
Totals (roughly):

Storage

$

Standalone
servers

$

"Batch" nodes

$

Total $

750 TB

500k

18

90k

55

275k

865k



FY2012
BABAR

complete LTDA purchase - CD already knows the details. Retire old fileservers, using returned thumpers from Fermi.

Fermi

expect ~400 TB fileservers and 10 standalone linux servers. Presumably to be used for retiring old servers. 

CDMS

perhaps 1-2 fileservers

ATLAS

The ATLAS Tier 2 projection is that we will spend about $220k on hardware (more if recharge costs are low, less if they are high). In addition, it is a reasonable guess that there will be up to $50k of other ATLAS-related purchases.

According to my rules of thumb, this will translate into at most 90 rack units and 27 kW dissipated.

We should also expect to retire our three oldest Thumpers, and offer to retire our 79 Sun X2200 M2s that are in one of the Black boxes.

KIPAC

- our FY11 CEP for storage should complete soonish with about 1/2 rack (4x4U + servers), power density is modest (~250W/U)
- FY12 is unclear, if we get the requested amounts then we would likely get ~48core/2U machines filling 2/3 rack at higher power
   density (700W/U)
DES:
- If DES uses BaBar leftovers, we need to keep those running and buy storage.  Estimated upper limit is 1/2 rack at modest power
   density (~250W/U)
  
So in summary we need something like 2 racks, one at high power and one and medium/low.  It is possible that something old gets retired
but nothing significant this year.

EXO

We have budgeted approximately $32k/year for file servers, $20k/year for miscellaneous servers (or whatever) and $5k/year for tape for the next few years. Given that we are now taking data at a fairly steady rate we will need to review our requirements and may need to make some adjustments.

Theory

Marvin Weinstein

I have an LDRD proposal that is being considered for the development of DQC.  If it is funded I plan to purchase 3 machines with a minimum of 48 processors and a good GPU and 64 GB of ram and at least 2 TB of hard drive.  Since these machines will have 4 or more real CPUs, they will have to run Windows Server.  I assume building 50 is your domain, I certainly plan to try and house these beasties with you.