You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 16 Next »

Steps to update the pipeline versions:

General Steps:

Steps to Perform

Glast Dev

Glast Prod

SRS Prod

Load Java Stored Procedures for the Datacatalog

Done

Done

 

Switch to srs namespace jobcontrol (dev)

Done

Done

 

Switch to srs namespace jobcontrol (prod)

 

 

 

Run jobcontrol daemon on glast,glastraw,glastmc

Done (glastlnx08)

 

 

Update SQL Wrappers for Java Stored Procedures for (Datacatalog_admin)

Done

 

 

Pipeline Web is deployed to dev or prod

Done (dev)

 

 

Load Java Stored Procedures for Pipeline

Done

 

 

Update PL/SQL for  Java stored procedures (SP_PROCINST, SP_STREAM)

Done

 

 

Verify Pipeline Client is updated to 1.1.0

Done

 

 

Verify pipeline table schema (add logroot column to jobsite, jobsite column to tasktype)

Done

 

 

Merge Pipeline execution directories

In Progress

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prepare dependencies for pipeline plugins:

Plugins:

org-glast-runquality-jar

Done

 

 

org-srs-datacat-client, org-srs-datacat-sp

Done

 

 

Dependencies:

org-srs-jobcontrol-2.0.0

Done

 

 

org-srs-pipeline-sp-1.4.0

Done

 

 

org-srs-datahandling-common-1.6.5

Done

 

 

Oracle jars

Done

 

 

mail-1.4.1, jython-2.5.2, commons-collections-3.2.1, jdom-1.1

Done

 

 

Other:

 

 

 

freehep-argv-2.0.1, org-srs-groupmanager-jar-1.16, jel-2.0.1-p1,

Done

 

 

log4j-1.2.13.jar

Done

 

 

 

 

 

 

  • No labels