*Meeting Minutes, February 28, 2006*
{maketoc}^
h1. Attendees:
| Bob Fuller (_absent_), | James Bong, | Tim Montagne (_absent_), |
| Tom Porter, | René Correa (_absent_), | Patrick Krejcik (_absent_), |
| Doug Murray | | |
h1. Agenda:
# Review actions from last time.
# Lab area update.
# Status of Hytec order.
# BC1 motion update.
# Schedule update.

h1. Previous Actions:
# *James* will install MS Project and update the schedule.
# *James* will check with Hytec regarding SMDS4 micro stepping option.
# *Tom* will investigate stepping motors to use for the BC1 articulating beamline.
# *Bob* will e-mail Josh Stein about the details of their beamline motion controls.
# *Patrick* will determine if a motorized beamline solution is essential for commissioning.
# *Patrick* will produce a PRD for the BC1 articulating beamline control.

h1. New Actions: (summary; see details below)
# *None* this week.

h1. Minutes:
# We reviewed the actions from last time.
## James has installed MS project and will update the schedule.
## He confirmed that the SMDS4 can be used in a micro step mode, and required hardware is being sent for evaluation.
## A manual hardware controller is coming from Hytec.
## Tom has spoke with Leif and motor investigation for BC1 is ongoing.
# There is still no network connection in the Bldg 25 Lab Area.  Doug sent another reminder to the SCCS team today.
# James mentioned some problems with test equipment at Hytec, as a result our shipment was delayed until next week.
# We discussed our apprehension regarding a single vendor with no backup
## Doug has looked into other vendors for the motor controllers, including an [IP motor controller|http://www.tews.com/Navigation/Internet/products-button,templateId=fs-topic.jsp,mid=1754,sid=5314.html] from [Tews|http://www.tews.com]
## At this point, we are awaiting the arrival of equipment from Hytec.
# Tom spoke with Leif regarding the BC1 motion.
## He confirmed that the discussion regarding belt drive versus gear drive was speaking to the linkage between the motor and the screw. Tom indicated that a gear drive was preferable to a belt drive.
## We would like to test the BC1 platform with comparable weight loading, to see the required force and motion characteristics firsthand.
# We reviewed the schedule
## Many of the tasks are okay as listed.
## Doug will update software tasks this week.
## James will update the schedule with additional hardware tasks, relating to prototyping and installation, by Thursday.