Beamtime ePixHR Feb 16/17 2024 - v2.xlsx

Shift scheduling:


Feb 16Feb 17
shift 1 (6p-1a)Philip, Dionisio, Kaz, Lorenzo, Alex (remote)Bhavna, Philip, Julian, Bojan, Alex (remote)
shift 2 (11p-6a)Bhavna, Zongde, Julian, Bojan, Dionisio (tentative), Alex (remote) Kaz, Zongde, Alex (remote) 


Lorenzo presentation and links:

...

  • Philip brought up that descrambling appears to not put the detector in the correct position. Dionisio has requested multi asic hardware for properly debugging this.
  • Lorenzo presentation:
    • We should run at 2.6V, it improved the linearity (both v1 and v2 has been updated to supply 2.6V to the ASIC now);

To Do:

Things to check before beamtime

  1. Run ePixHR in RIXS DAQ with 5160/120
  2. Test pedestal and timing scan scripts
  3. Check that pedestal scan can run with large event numbers per gain mode (for temp stabilization)
  4. Temp stabilization (configuration time, or add time at start of ever run?) – check during beamtime
  5. Set temp to 15C/to the degree possible before beamtime
  6. Test Grafana for live temp readout
  7. Documentation
  8. Take test data pre-beam:
    1. 5 pedestal
    2. Timing scan without beam
    3. ACQ start on scope