Capability | Type | Aim | Date available | Previous availability date |
Running LCLS-II detectors at XPP. | LCLS beam line testing | Run fiber from RIXS to XPP so LCLS-II detectors (ePixM, ePixHR) can be tested there | Feb-March 2023 | N/A |
Running LCLS-II detectors at FEH. | LCLS beam line testing | Run fiber (DRP solution) from RIXS to FEH so LCLS-II detectors (ePixM, ePixHR) can be tested at MFX/XCS/CXI | June 2023 (subject to availability of installed fiber cable) | N/A |
E-gun X-ray source | ASC X-ray source | pulsed X-ray source at ASC | TBD |
Beamtime schedule
Experiment number | Station | Aim | Dates | Lead from Ops team side |
X-10025 | MEC | Energy and burst rate frontier using a GaAs Icarus Detector. | 2023: 28 April (Night), 29 April (Day), April 30 (Night), May 1 (Day) | Philip Hart |
| ||||
| ||||
ePixHR | MFX | Evaluate the performance of the ePixHR detector. | 2023: 29 Aug (night), 14+15 Sept. (night). | Conny Hansson |
ePixM | MFX | Evaluate the performance of the ePixM detector. | Early 2024 | Conny Hansson |
ePixM | MFX | Evaluate the performance of the ePixM detector. | March-April 2024 | Conny Hansson |
ePixM | chemRIXS | Evaluate the performance of the ePixM detector. | Before June 2024 | Conny Hansson |
...