      1. Prepare work:
        1. Record current iocSpecificRelease for sioc-b81-mc03:
          1. iocSpecificRelease -> /u/cd/tthayer/workspace/LCLSII/SXRU/Undulator_SXR_MMF/
      2. During the test day:
        1. Boot current EPICS 3 based IOC, record settings:
        2. Currently sioc-b81-mc03 is running, need to check again before test
        3. Open EDM based Undulator GUI
          1. login lcls-dev3
          2. cd ../tthayer
          3. cd LCLSII/SXRU/Undulator_SXR_MMF/util/prod
          4. ./xxx
        4. Before any movement, record all the settings.
          1. Take screenshots from GUI
          2. Follow  checkout sheet to process the practice tests
        5. Print the checkout sheet
        6. According to the checkout sheet, the main motion test should be as follows:
          1. Tests will verify the correct operation of the following motion controls:
          2. Wiring, switch status, ESTOP functionality.
          3. Coordinated motion for gap adjustment.
          4. Encoder read back: available, calibrated.
          5. Limit, tilt, and vacuum switches: single axis, coordinated motion.
        7. Stop the test if encounter any issue/hazard, contact Alex for help.