...
May need to rerun through half-pipe. See: https://www-glast.stanford.edu/protected/mail/opsprob/10896.html
- The MOOT Key Mismatch problem occurred on 2023 July 18. See the Fermi news item for 2023 July 20 at https://fermi.gsfc.nasa.gov/ssc/library/news/
- 8 LPA runs from the LAT had to have their MOOT keys manually fixed in Oracle and MySQL before they could be processed correctly through L1:
- 711402686, 711405073, 711411046, 711416992, 711422925, 711428850, 711451782, 711478257
- The MOOT Key Mismatch problem occurred on 2017 November 30. See: https://www-glast.stanford.edu/protected/mail/opsprob/10893.html
The