Production Camera Delivery

Camera

type

Aim

Date at ASC

Previous delivery dateNeed date in hutch

ePix10k small, 1mm Si 

sidefacer

Added to operations; Commissioned by Sebastien.

Unclear

July 2022N/A

ePix10k2M.2

non-ghosting ASICs

Added to operation; currently aimed at MFX but needs to be discussed with beam lines ones it is delivered.

April 2023

Nov. 2022ASAP
ePixM90To be installed at REXS chamber at qRIXS

April 2023
ePixM0To be installed at ChemRixs chamber

April 2023
ePixM?To be installed at the end of new (currently not excisting) spectrometer arm next to qRIXS spectrometer arm

At least a year after first ePixM detector
ePixHR 2MLarge ePixHR cameraTo be installed at TXI.

After start 2024 (chamber delivered start 2024)
ePixHR smallSmall ePixHR camera; same form factor as side facing ePix100To be installed at TXI.

end of 2023.
ePixHR smallSmall ePixHR camera; same form factor as side facing ePix100To be installed at TXI.

end of 2023.

Refurb. Delivery

Camera

type

Aim

Date at ASC

Previous delivery dateNeed date in hutch

CSPAD 2M

CXI's large CSPAD detector

inner module is broken and need to be replaced. The Detector has been delivered to Kenney together with 2 small CSPAD units to be scavenged for the repair. To be returned for operation at CXI.

Dec 2022

Feb 2023March 2023

Testing capability schedule

Capability

Type

Aim

Date available

Previous availability date

Running LCLS-II detectors at XPP.

LCLS beam line testing

Run fiber from RIXS to XPP so LCLS-II detectors (ePixM, ePixHR) can be tested there

Feb-March 2023

N/A

Running LCLS-II detectors at FEH.

LCLS beam line testing

Run fiber (DRP solution) from RIXS to FEH so LCLS-II detectors (ePixM, ePixHR) can be tested at MFX/XCS/CXI

June 2023 (subject to availability of installed fiber cable)

N/A
E-gun X-rau sourceASC X-ray sourcepulsed X-ray source at ASCTBD

Beam time schedule

Experiment number

Station

Aim

Dates

Lead from Ops team side

X-10025

MECEnergy and burst rate frontier using a GaAs Icarus Detector.2023: 28 April (Night), 29 April (Day), April 30 (Night), May 1 (Day)Philip Hart