  • Closely toleranced pins/bushings – same approach as used for 19-0 tooling
    • Requirement: +/-75um module position tolerance in local support coordinate system (per requirements document "ITk Pixel Module Loading Accuracy Requirements" AT2-IP-ES-006-v3)
    • Distribute tolerances:
      • +/-50um module position relative to loading tooling baseplate coordinate system (to avoid collisions with 100um gap between modules).
        • Dowel pins in baseplate – two per module location.
        • Bridge to have bushing and slot for precision fit onto dowel pins.
      • +/-25um local support position relative to loading tooling baseplate coordinate system (to accurately place modules to meet +/-75um requirement).
        • Dowel pin in baseplate – to accurately locate one end of the Stave in Z.
        • Tooling to fasten to mounting features on ends of Stave.
  • Glue with beads to control glue layer thickness
    • 100um dia beads, for ~75um glue layer thickness on carbon fiber.
    • Loading tooling does NOT control the glue layer thickness.
      • Loading bridge to rest on the module's pickup areas (vacuum pad locations) during gluing.
      • Loading bridge to have micrometer adjusters to level the tool relative to the baseplate – to apply pressure at all vacuum pad locations during gluing.
      • Loading bridge to have micrometer adjusters to level the tool relative to the pickup table – to make good contact between vacuum pads and module.
  • Vacuum pads to pick up modules
    • Vacuum pads to fit within clear areas on modules.
    • Height adjustment of vacuum pads while on pickup table.
    • Vacuum to securely hold modules.
  • Tolerances:
Tolerance ItemWhere UsedTolerance (mm, Dia.)

Pick-up Table Edge Repeatability

(for successive modules)

Locating Module to Pickup Table.012
Bridge Bushing IDLocating Loading Bridge to Pick-up Table.012
Pick-up Table Pin ODLocating Loading Bridge to Pick-up Table.012
 Pin LocationLocating Loading Bridge to Pick-up Table.020
Bridge Bushing ID Locating Loading Bridge to Loading Fixture.012
Baseplate Pin ODLocating Loading Bridge to Loading Fixture.012
 Pin LocationLocating Loading Bridge to Loading Fixture.020

Total:

.100mm   (+/-.050mm)