  • Stave Loading Tooling, 19-1 RD53a L1 Stave – .zip - 11 March 2022.zip
  • Stave Loading Tooling, 19-1 RD53a L0 Stave
  • Ring Loading Tooling, 19-1 RD53a
  • Handling Frame, 19-1 RD53a L1 Stave
  • Shipping Box, 19-1 RD53a L1 Stave


Stave Loading Tooling, 19-1

...

L1 Stave

Version 2, revised, Stave Loading Tooling drawing drafts (not released):

...

Some draft prints sent to quote:



ItemsVendorDateResponse
  • REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE)
  • REF-000205158 (PICK UP TABLE, RD53a QUAD)
  • REF-000202289 (LOADING BRIDGE)
GoProto3/3/2022Working on quote
  • REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE)
  • REF-000205158 (PICK UP TABLE, RD53a QUAD)
  • REF-000202289 (LOADING BRIDGE)
SLAC machine shop3/4/2022
  • REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE)
  • REF-000205158 (PICK UP TABLE, RD53a QUAD)
  • REF-000202289 (LOADING BRIDGE)
KAL Machining3/7/2022No bid (capacity)
  • REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE)
  • REF-000205158 (PICK UP TABLE, RD53a QUAD)
  • REF-000202289 (LOADING BRIDGE)
Parametric USA3/7/2022

Quote: PQ104809.pdf

$8k, 4-5 week lead

Ordered 3/29/2022

  • REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE)
  • REF-000205158 (PICK UP TABLE, RD53a QUAD)
  • REF-000202289 (LOADING BRIDGE)
Pro-Tek Manufacturing3/7/2022Received


Loading Tooling, OB L1 Stave:

Section view:


Summary of requirements for loading 19-1 Outer Barrel Stave:

  • Load RD53a Quad modules (drawings: 150um, 400um) with connectors oriented as shown in picture above
  • Load modules onto 19-1 OB L1 Stave (no drawing yet, preliminary CAD on LBL Windchill site)
  • Load without collisions: 200um nominal gap / 100 micron minimum gap between modules (no assembly drawing yet showing modules on stave)
  • Glue layer thickness to be 100um -50/+100um
  • ESD protection during loading: grounding of tooling
  • Mechanical protection of wire bonds during loading: stay clear of wire bonds, handle modules using tooling only, consider covers/shields
  • Baseplate to be installed onto glue robot: weight limit 7kg (per manual)
  • Stave to be removed from baseplate and transferred to test box for QC testing

...

Dimensioning scheme changed to hole-to-hole tolerancing (instead of hole-to-edge): 

Tolerance ItemWhere UsedTolerance (mm, Dia.)
Pick-up Table Edge RepeatabilityLocating Module to Pickup Table (repeatability of lining up module to machined edges)0.025
Pickup Table Bushing IDLocating Loading Bridge to Pick-up Table0.019
Bridge Pin ODLocating Loading Bridge to Pick-up Table0.015
Baseplate Hole ID Locating Loading Bridge to Loading Fixture0.025
Bridge Pin ODLocating Loading Bridge to Loading Fixture0.015
Baseplate Hole LocationLocating Loading Bridge to Loading Fixture (hole locations dimensioned as +/-.04 from adjacent hole, i.e. up to -.02 per hole)0.020

Total:

.119mm   (+/-.060mm)


Root Sum Square:.050mm   (+/-.025mm)

...

Stave Loading Tooling, 19-1 IB Stave

Requirements - see OB L1 Stave requirements above.

...

Design concept: modify design of 19-1 OB L1 Stave tooling to match Triplet dimensions and pickup areas

...

Drawings (not released):  REF-000202479 (SHIPPING AND STORAGE FIXTURE, OB L1 STAVE, 19-1) CHECKPRINT 14FEB2022.zip

Handling Frame with 19-1 OB L1 Stave:


Interface block to join Stave and Handling Frame (drawing not released):

...