- Stave Loading Tooling, 19-1 RD53a L1 Stave – .zip - 11 March 2022.zip
- Stave Loading Tooling, 19-1 RD53a L0 Stave
- Ring Loading Tooling, 19-1 RD53a
- Handling Frame, 19-1 RD53a L1 Stave
- Shipping Box, 19-1 RD53a L1 Stave
Stave Loading Tooling, 19-1
...
L1 Stave
Version 2, revised, Stave Loading Tooling drawing drafts (not released):
...
- Top Level Assembly: REF-000202041 (LOADING FIXTURE ASSY, 19-1 OB L1 STAVE).pdf
- Baseplate: REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE, OB L1 STAVE, 19-1, V2).pdf
- Loading Bridge: REF-000202287 (LOADING BRIDGE, FIXTURE, 19-1 OB L1 STAVE).pdf
- Covers for loaded modules: REF-000202337 (COVER SECTION, 19-1 OB L1 STAVE).pdf
- Pickup table assy: REF-000202485 (PICK UP TABLE, QUAD, 19-1 OB L1 STAVE LOADING FIXTURE).pdf
- Handling Frame Assembly: REF-000203023 (HANDLING FRAME, OB L1 STAVE, 19-1).pdf
Some draft prints sent to quote:
Items | Vendor | Date | Response | ||||
---|---|---|---|---|---|---|---|
| GoProto | 3/3/2022 | Working on quote |
| SLAC machine shop | 3/4/2022 | |
| KAL Machining | 3/7/2022 | No bid (capacity) | ||||
| Parametric USA | 3/7/2022 |
| Pro-Tek Manufacturing | 3/7/2022 | Received |
Loading Tooling, OB L1 Stave:
Section view:
Summary of requirements for loading 19-1 Outer Barrel Stave:
- Load RD53a Quad modules (drawings: 150um, 400um) with connectors oriented as shown in picture above
- Load modules onto 19-1 OB L1 Stave (no drawing yet, preliminary CAD on LBL Windchill site)
- Load without collisions: 200um nominal gap / 100 micron minimum gap between modules (no assembly drawing yet showing modules on stave)
- Glue layer thickness to be 100um -50/+100um
- ESD protection during loading: grounding of tooling
- Mechanical protection of wire bonds during loading: stay clear of wire bonds, handle modules using tooling only, consider covers/shields
- Baseplate to be installed onto glue robot: weight limit 7kg (per manual)
- Stave to be removed from baseplate and transferred to test box for QC testing
...
Dimensioning scheme changed to hole-to-hole tolerancing (instead of hole-to-edge):
Tolerance Item | Where Used | Tolerance (mm, Dia.) |
Pick-up Table Edge Repeatability | Locating Module to Pickup Table (repeatability of lining up module to machined edges) | 0.025 |
Pickup Table Bushing ID | Locating Loading Bridge to Pick-up Table | 0.019 |
Bridge Pin OD | Locating Loading Bridge to Pick-up Table | 0.015 |
Baseplate Hole ID | Locating Loading Bridge to Loading Fixture | 0.025 |
Bridge Pin OD | Locating Loading Bridge to Loading Fixture | 0.015 |
Baseplate Hole Location | Locating Loading Bridge to Loading Fixture (hole locations dimensioned as +/-.04 from adjacent hole, i.e. up to -.02 per hole) | 0.020 |
Total: | .119mm (+/-.060mm) | |
Root Sum Square: | .050mm (+/-.025mm) |
...
Stave Loading Tooling, 19-1 IB Stave
Requirements - see OB L1 Stave requirements above.
...
Design concept: modify design of 19-1 OB L1 Stave tooling to match Triplet dimensions and pickup areas
...
Drawings (not released): REF-000202479 (SHIPPING AND STORAGE FIXTURE, OB L1 STAVE, 19-1) CHECKPRINT 14FEB2022.zip
Handling Frame with 19-1 OB L1 Stave:
Interface block to join Stave and Handling Frame (drawing not released):
...