Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Set known values on mpod.
  • Pin out cable according to diagram.
  • Turn off mpod.
  • Connect power cable to detector.
  • Set operating voltages on mpod.
  • Start DAQ and configure to begin idle.

Stabilize for 15 minutes

  • For 10k: Wait for temperature < 10C and humidity ~ < 10% (ideally under 5%)

Record Voltage/Current/Temperature Values

...