Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Corrected typo in pw

...

  1. Turn dry-air valve counterclockwise ¼ turn.
    There should be a hissing noise from the air flow.

    Info

    This dry air is used to control EFD and height gauge.


  2. Turn EFD on
    The screen will display a default menu. 
    The settings for SE4445 are preset 001 and make sure it is set on "steady".

    Info

    To change the settings refer to Building 33 - Setting up for gluing in the lab for instructions.






  3. Turn on glue robot.




  4. The Itk account on the PC has the Janome Points software installed to control the robot. 

    Info

    The password is AtlasITkBox AtlasItkBox. For info about the itk-admin account contact Matthias Wittgen


  5. Click on the desktop icon JR C-Points to start the program
    PointIcon.png
  6.  If a window is shown - please select the following options to initialize the program :  

    •  JR2500-N bullet 
    •  z-axis control 
    •  R-axis control (not ticked!)
    •   IO-A (not ticked) 

     




  7. Open the file Neha_2020Feb3_InnerRingx3.cpd it should be the most recent file select the program # 


    Info

    The program # is displayed on the right.


    We are using the program #13 for the triplet in a row.

    Note that the pallet routine is #22 (plane, with auto-increment)



  8. Initialize the robot with Meca Initialize



     

    Info

    Verify that the z position is placed correctly by using the Tool option to verify the PTP point – hit Go and don't hit Register until you are sure about you want to update the xyz position.




     




  9. To execute the program hit Send C&T data from the Robot menu. 

    Info

    Make sure that the Robot is set in Teaching mode in the Changing Mode window from the Robot menu.


  10. Select Switch Run Mode in the Changing Mode window from the Robot menu.

  11. Select the program #  to execute from the Robot command buttons. It will be displayed on the LED. 



    Info

    Make sure to use the same # selected in point 7.



  12. Push the green start button. 

    Info

    At any moment if any issue to terminate push the RED button



  13. To repeat : 
    1. switch to Teaching mode in the Changing Mode window from the Robot menu. 
    2. made the proper changes to the program 
    3. restart from #9

  14. To terminate - before you leave the station:
    1. Bring the robot back in the original position with Meca Initialize
    2. Shut down the robot
    3. Shut down the EFT
    4. Turn off the valve
    5. Terminate the program
    6. Shut down the screen only of the PC

...

Page properties
hiddentrue


Related issuesfor more info about the program please check : Building 33: Programming and using the glue robot