Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Introduction - beam test goals and preparation, sections 1,2 (Luca/Philippe)
Beam test setups, DAQ, online, CU integration and operation (Nicola)
CU calibration with CR and beam (Sasha for CAL, Leon for TKR, Alex for ACD) ACD textACD fig1
Simulation, Francesco, section 6
TKR and PSF, sections 7.1 8.1 (Leon, Nicola)
Energy resolution, sections 7.2, 8.2 (Philippe)
ACD results, sec 8.3 (Luis) pdf tex fig 1 (eps|gif) fig2 (eps|gif)
Background sources, scetion 9 (Johan, Carmelo)
GSI stuff, scetion 10 (Luca)ACD
Conclusions ...

Deadlines

march 12 - internal BT deadline to circulate different contributions for merging
march 19 - internal LAT deadline to circulate draft for review