Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

ExtensionContactExtensionContact
2151Main Control (MCC) Operator8556Carsten Hast
2811ESA counting house2084Keith Jobe

4299

Radiation Physics (for ESA exit survey)5200Mike Dunning
4371End Station A floor2887Martin Kocian
2551Main Gate security guards (door keys)3912Matthias Wittgen
 Su Dong cell phone:  650 430 44702284Su Dong
 Timon Heim cell phone: 510 944 9508  

ESTB DAQ Configuration

The Caladium telescope control and DAQ is handled by the National Instrument (NI) crate which collects data via the TLU with data producers from the telescope itself and the DUT. The DUT readout is upgraded to a simpler arrangement with just the HSIO-II controlled by the ESADUTDAQ1 server node (replacing ESA-USER02) via a direct private ethernet link. Due to the very short ESTB bunches, there is no need for additional triggers within the bunch and the DAQ is simply driven by the bunch crossing beam trigger. The SWH-B061-NW01 network switch in the middle of the ESA hall support the ESA-RESTRICTED local network 172.27.104.* (port 25-48) where both the NI crate and ESADUTDAQ1 reside on. The EUDAQ console PC AR-EUDAQ in the ESA Control Room and several other nodes e.g. AR-ESAUX2 are connected to the ESATESTFAC public subnet 172.27.100.* (port 1-24) on the same switch, but can also see the local ESA-RESTRICTED subnet. The connection from the NI crate and ESADUTDAQ1 to the switch are routed through the Belgen patch panel inside the tunnel near the optical table.        

...