Introduction:
Two test beam periods are scheduled in 2009 at CERN: May and October. These tests are crucial in view of validating the sensor for the IBL, but also for the SLHC tracker upgrade.
ATLAS TestBeam periods in 2009
- 10-17 Oct. in H6 with the EUDET telescope
- 24-04 Nov. in H8 (depending on if we can switch with ALFA) with the BAT and Morpurgo magnet
- 20-25 Nov. in H6 with the BAT (preliminary)
Official documents: Periods and Calendar
See todo list
The test beam setup is based on two main components:
- Silicon telescope (so called "Bonn" telescope or BAT) with is its own DAQ and monitoring. Have integrated the TurboDAQ system.
- 3D assemblies read out by TurboDAQ (1 TurboDAQ per tested board). We shall have at least 3 TurboDAQ available, plus one in the lab (building 161).
Several important preparation activities have to be performed soon, both hardware and software:
- setup mailing lists.
- general test beam plan: what type of measurement do we want to do.
- test and debug of the Bonn telescope, in the lab. Bonn telescope availability needs to be confirmed.
- understand the synchronization problem between TurboDAQ and the the telescope DAQ.
- the devices will be beam tested in a 2T magnet. The setup has to be modified to be able to run, safely, in this environment.
- modify the setup to be able to read out several (3 or 4) 3D boards.
- some of the tested assemblies will be irradiated prior to the test beam. These devices will be kept cold and will have to be beam tested cold. A cold box has to be designed (and has to able to operate in the 2T magnetic field).
It will be very important to have a fast online feedback, in particular on several key measurements for which the analysis software should be available to run online. General data analysis will have to be performed as soon as data are taken. In order to achieve high data analysis efficiency during the test beam periods, several actions are planned:
- restart the software working group
- share the code among all analysts
- resume asap the weekly analysis meetings
- train data analysis on 2008 test beam data
- setup an electronic logbook.
- resume simulation studies.
- understand where to store the data.
With less priority, two points were also discussed:
- use of the EuDet telescope, which offers much better space resolution. The EuDet telescope has smaller aperture compared to the Bonn telescope so a fast online alignment would be more critical. DAQ compatibility and synchronization would require work. Contact with EuDet people has been made.
- development of an improved testbeam DAQ system.
Pictures from visit to the test beam area in CERN Prevessin
Some pictures of the building, beam line, cooling box, magnet, etc. can be found here.
Test Beam Analysis
Some notes from January 2009 meeting at SLAC:January 2009 meeting notes
CERN Test Beam Area
Some pictures of the building, beam line, cooling box, magnet, etc. can be found here.
Test beam pictures
Picture can be found in the shared documents (protected, contact page author to get these pictures)here and here.
Test Beam Analysis Information:
- Conference proceeding of 2006 Test Beam from Ole: NSS-3D-record.pdf
- February 2009 Analysis Tutorial from Havard
- TestBeam 2008 analysis presentation Havard, Sept 2008: Havard_Sept2008
- TestBeam 2006 analysis presentation Markus, Sept 2008: Markus_Sept08_tb2006
- IEEE 2008 Proceedings from Markus: arXiv:0806
2009 Test Beam:
- June 10th Software Meeting: agenda
- June 04th Software Meeting: agenda
- April 29th Software meeting agenda
- April 2nd Software meeting agenda
- First version (April 2nd) of Data Quality Monitoring file: run9430-9490-DataQuality-id164.pdf
Bonn Analysis Telescope Information
- Manual (Thesis) BAT documentation.pdf
- NIM paper ATLAS Beam Telescope-NIM 2002.pdf
EUDET Telescope Information
- Project web page: EUDET
- Installing the EUDAQ framework
MCC controller board
Description of a MCC controlled board to read out multiple single chips.
- http://www.ge.infn.it/ATLAS/Electronics/home_frames/PixTelescope_frame.html
- Some introductory information can also be found here:http://www.slac.stanford.edu/~phansson/files/phansson_slac_group_meeting_140809.pdf
- MCC boards at SLAC.
- Conference proceeding of 2006 Test Beam from Ole: NSS-3D-record.pdf
- February 2009 Analysis Tutorial from Havard