  • Stave Loading Tooling, 19-1 RD53a OB StaveL1 Stave – .zip - 11 March 2022.zip
  • Stave Loading Tooling, 19-1 RD53a IB L0 Stave
  • Ring Loading Tooling, 19-1 RD53a
  • Handling Frame, 19-1 RD53a OB L1 Stave
  • Shipping Box, 19-1 RD53a OB L1 Stave


Stave Loading Tooling, 19-1

...

L1 Stave

Version 2, revised, Stave Loading Tooling drawing drafts (not released):

.zip of all drawings and .step files - 11 March 2022.zip

Some draft prints sent to quote:



3/7/2022
ItemsVendorDateResponse
ItemsVendorDateResponse
  • REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE)
  • REF-000205158 (PICK UP TABLE, RD53a QUAD)
  • REF-000202289 (LOADING BRIDGE)
GoProto3/3/2022Working on quote
  • REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE)
  • REF-000205158 (PICK UP TABLE, RD53a QUAD)
  • REF-000202289 (LOADING BRIDGE)
SLAC machine shop3/4/2022
  • REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE)
  • REF-000205158 (PICK UP TABLE, RD53a QUAD)
  • REF-000202289 (LOADING BRIDGE)
KAL Machining
  • REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE)
  • REF-000205158 (PICK UP TABLE, RD53a QUAD)
  • REF-000202289 (LOADING BRIDGE)
Parametric USA3/7/2022

Quote: PQ104809.pdf

$8k, 4-5 week lead

  • REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE)
  • REF-000205158 (PICK UP TABLE, RD53a QUAD)
  • REF-000202289 (LOADING BRIDGE)
Pro-Tek Manufacturing3/7/2022

Ordered 3/29/2022

Received


Loading Tooling, OB L1 Stave:

Section view:


Summary of requirements for loading 19-1 Outer Barrel Stave:

  • Load RD53a Quad modules (drawings: 150um, 400um) with connectors oriented as shown in picture above
  • Load modules onto 19-1 OB L1 Stave (no drawing yet, preliminary CAD on LBL Windchill site)
  • Load without collisions: 200um nominal gap / 100 micron minimum gap between modules (no assembly drawing yet showing modules on stave)
  • Glue layer thickness to be 100um -50/+100um
  • ESD protection during loading: grounding of tooling
  • Mechanical protection of wire bonds during loading: stay clear of wire bonds, handle modules using tooling only, consider covers/shields
  • Baseplate to be installed onto glue robot: weight limit 7kg (per manual)
  • Stave to be removed from baseplate and transferred to test box for QC testing

...

  • Closely toleranced pins/bushings – same approach as used for 19-0 tooling
    • Requirement: +/-75um module position tolerance in local support coordinate system (per requirements document "ITk Pixel Module Loading Accuracy Requirements" AT2-IP-ES-006-v3)
    • Distribute tolerances:
      • +/-50um module position relative to loading tooling baseplate coordinate system (to avoid collisions with 100um gap between modules).
        • Dowel pins in baseplate – two per module location.
        • Bridge to have bushing and slot for precision fit onto dowel pins.
      • +/-25um local support position relative to loading tooling baseplate coordinate system (to accurately place modules to meet +/-75um requirement).
        • Dowel pin in baseplate – to accurately locate one end of the Stave in Z.
        • Tooling to fasten to mounting features on ends of Stave.
  • Glue with beads to control glue layer thickness
    • 100um dia beads, for ~75um glue layer thickness on carbon fiber.
    • Loading tooling does NOT control the glue layer thickness.
      • Loading bridge to rest on the module's pickup areas (vacuum pad locations) during gluing.
      • Loading bridge to have micrometer adjusters to level the tool relative to the baseplate – to apply pressure at all vacuum pad locations during gluing.
      • Loading bridge to have micrometer adjusters to level the tool relative to the pickup table – to make good contact between vacuum pads and module.
  • Vacuum pads to pick up modules
    • Vacuum pads to fit within clear areas on modules.
    • Height adjustment of vacuum pads while on pickup table.
    • Vacuum to securely hold modules.
  • Tolerances:

Dimensioning scheme changed to hole-to-hole tolerancing (instead of hole-to-edge): 

Tolerance ItemWhere UsedTolerance (mm, Dia.)
Pick-up Table Edge RepeatabilityLocating Module to Pickup Table (repeatability of lining up module to machined edges)Locating Module to 0.025
Pickup Table .000Bridge Bushing IDLocating Loading Bridge to Pick-up Table0.012019
Bridge Pick-up Table Pin ODLocating Loading Bridge to Pick-up Table0.012
 Pin LocationLocating Loading Bridge to Pick-up Table.025
015
Baseplate Hole Bridge Bushing ID Locating Loading Bridge to Loading Fixture0.012025
Baseplate Bridge Pin ODLocating Loading Bridge to Loading Fixture0.012015
 Pin Baseplate Hole LocationLocating Loading Bridge to Loading Fixture (hole locations dimensioned as +/-.04 from adjacent hole, i.e. up to -.02 per hole)0.025020

Total:

.98mm 119mm   (+/-.050mm060mm)


Root Sum Square:.043mm  050mm   (+/-.019mm025mm)

Stave position relative to loading tooling baseplate

...

:

Tolerance ItemWhere UsedTolerance (mm, Dia.)
 Pin LocationLocating Stave to BaseplateLoading Bridge to Loading Fixture (hole locations dimensioned as +/-.04 from adjacent hole, i.e. up to -.02 per hole)0.020.025

Pick-up Table Edge Accuracy

(absolute position)

Locating Module to Pick-up Table*choose loading tooling baseplate coordinate system to line up with 1st module

*this item affects all modules equally so does not affect gap/distance between modules

0.025060

Total:0.080mm (+/-.040mm)

Root Sum Square:0.050mm   063mm (+/-.025mm032mm)
  • Total for all:
    • Limit: +/-.074mm100mm
    • Root sum square: +/-.040mm
    • Requirement: +/-.150mm
  • Module Nominal Spacing (for 19-1 L1 Stave): .250mm (nominal gap)
    • Worst case clearance: 0.012mm
    • Clearance with RSS tolerance (3σ): 0.180mm.028mm


A design/drawings were made in 2020 (Version 1, deprecated, not released):

...

Stave Loading Tooling, 19-1 IB Stave

Requirements - see OB L1 Stave requirements above.

...

Design concept: modify design of 19-1 OB L1 Stave tooling to match Triplet dimensions and pickup areas

...

Drawings (not released):  REF-000202479 (SHIPPING AND STORAGE FIXTURE, OB L1 STAVE, 19-1) CHECKPRINT 14FEB2022.zip

Handling Frame with 19-1 OB L1 Stave:


Interface block to join Stave and Handling Frame (drawing not released):

...